background image

Page 2 

 

 

 

 

 

 

 

 

 

 

        INST2063 - 6/14 

2.0  

Important Information 

 
All radioactive devices using Polonium-210 are leased for one (1) year.  It is important to keep 
track of these units so that they can be returned to NRD for proper disposal.  If the device is 
misplaced, please call NRD for information on how to report the lost device. 
 
2.1  

Safety of NRD Ionizers 

 
The radioactive material (Polonium-210) is 100% encapsulated using a pressure welded 
metallurgy technique.  The result is an encapsulation that is insoluble and inert to most 
chemicals.  Vibration and impact normal to industrial applications will not adversely affect 
product integrity. 
 
The alpha particles come from the natural decay of the radioactive source and collide with air 
molecules to create ions.  However, alpha particles are unable to penetrate a thin piece of paper 
or human skin!  Complete safety is ensured when the ionizers are used in accordance with 
normal mounting and operating conditions.  Normal use and conditions of the ionizer include: 
 

 

Temperature not to exceed 212° F (100° C). 

 

 

Use air, nitrogen or an inert gas. 

 

 

   You can safely handle the outside of cell.  Do not insert any object or attempt to clean 

the inside of the cell. 

 

 

   Mount the ion cell in a normal way by using the mounting posts of the ion cell.  Do 

not alter the ionizer in any way, i.e. drilling holes.  Contact us for mounting options. 

 
Review the enclosed 

Safety Brochure 

for a more detailed description of how the ionizers work, 

where they are typically used, and the general safety of NRD ionizers. 
 
2.2  

Lease Agreement 

 
All ionizers containing Polonium-210 are leased, not purchased.  The devices are leased for two 
main reasons: 1.)  Federal Regulations state that the device must be tested for radiation leakage 
prior to shipping and before 13 months from the date of manufacture.  NRD performs these leak 
tests and provides you with a Leak Test Certificate as documentation. 2.) The activity of the ion 
cell decreases over time.  At the end of 12 months, the cell needs to be replaced (or renewed) in 
order to maintain its effectiveness. 
 
NRD will notify you when it is time to renew the device.  To renew the lease when the device 
reaches its 12 month expiration (the manufactured date is printed on the label of device), simply 
provide us with a new purchase order to make the original lease valid for another 12 months.  
Upon delivery of the renewed device, remove the old cell from service and ship it back in 
accordance with the 

Return Shipping Instructions

Summary of Contents for Nuclecel P-2063

Page 1: ...63 Nuclecel Ionizer Accessories CONTENTS 1 0 Introduction Page 1 1 1 Our Thanks 1 2 Other NRD Products 1 3 Customer Support 2 0 General Information Page 2 2 1 Safety of NRD Devices 2 2 Lease Agreement 2 3 Return of Expired Devices Page 3 3 0 Model P 2063 Nuclecel Ionizer 4 0 Accessories Page 4 4 1 Model 4064 Fan 5 0 Troubleshooting Page 5 APPENDIX Data Sheet Specifications Page 6 Safety Brochure ...

Page 2: ...or control electrostatic charges The many product configurations we offer will fit a wide field of applications Just call us with your application and we can provide a solution The electronics industry uses air ionizers to reduce product damage and loss Application of ionizers in the printing converting and graphics industries allow in process cleaning of product and faster process speeds Higher p...

Page 3: ...bject or attempt to clean the inside of the cell Mount the ion cell in a normal way by using the mounting posts of the ion cell Do not alter the ionizer in any way i e drilling holes Contact us for mounting options Review the enclosed Safety Brochure for a more detailed description of how the ionizers work where they are typically used and the general safety of NRD ionizers 2 2 Lease Agreement All...

Page 4: ...to the ion cell can also be effectively neutralized without the need of air movement 3 1 Installation Operation A One common method to install the P 2063 Nuclecel Ionizer is by using spring clips that will snap on to the posts of the Ionizer The spring clips can be attached to a mounting base There are other methods to mounting the cell but cannot involve modifying the Ionizer Do not alter the P 2...

Page 5: ...the below diagram showing the installation of the P 2063 Nuclecel Ionizer Snap in the Ionizer by aligning the Ionizer posts with the spring clips The orientation of the Ionizer does not matter since it is symmetrically designed D Re assemble the front blower housing and tighten the two phillips head screws Tightening the screws will secure the ion cell inside the fan assembly E Position the Fan As...

Page 6: ...e Action 1 Static charges are not eliminated Ion cell may be out of date and need replacement Possible oil contamination of ion cell Ions generated are being recombined before they reach the charged surface Call NRD for Ion Cell replacement Return cell to NRD for evaluation Do not attempt to clean the device Position the fan closer to the charged part 2 Fan does not turn on No power Blown fuse int...

Reviews:

Related manuals for Nuclecel P-2063