NWDC
IM 26 MAR 2014 © 2014 Novatec, Inc. All Rights Reserved
Page 28
[Type text]
[Type text]
NWDC IM 26 MAR 2014
NOTE: These settings
should be adjusted to
optimal values after starting
to run material.
Press each function button
to enter or change values
for Machine Mount
Receiver.
STEP#7:
Depress
then Convey Menu
This screen can also be accessed by pressing and holding the Hopper Receiver icon
on page 19.
STEP #8:
Press
Button for Machine Mount Receiver
This screen can also be accessed by pressing and holding the Machine Mount Receiver icon
on page 19.
The Hopper Loader screen
will appear.
NOTE: These settings
should be adjusted to
optimal values after starting
to run material. Press each
function button to enter or
change value, including
Blowback if that option was
supplied.
3
Load Time
Purge Time
Dump Time
Number of
cycles of
failure to load
before an
alarm
Turn
MM Receiver
On/OFF
11
Hopper Receiver
40
10
15
3
3
50
2
NOTE: These settings should
be adjusted to optimal values
after starting to run material.
Press each function button to
enter or change value,
including Blowback and
Proportioning if either or both
those options was supplied.