2
Document: GFH-NT 1500-4000 IM 14 DEC 2016
Gas Fired Heater Instructions
©2016 NOVATEC, Inc. All Rights Reserved
TABLE OF CONTENTS
1.0 ENGINEERING DATA
5
1.1 APPLICABLE DRAWINGS
5
1.2
TYPICAL OPERATIONAL PARAMETERS
5
1.3
UTILITIES
– ELECTRICAL
5
1.4
UTILITIES - NATURAL GAS
6
1.5
INSTRUMENT SETTINGS AND DATA
7
2.0 GETTING STARTED SUMMARY FOR QUALIFIED TECHNICIANS
9
2.1 WARNINGS
9
3.0
INTRODUCTION
11
3.1 ELIPSE BURNER
12
Photograph, Typical Eclipse Burner
12
Sketch - Cross-section of Nozzle Mixing Burner
12
3.2 CONTROL PANEL
13
4.0 UNPACKING
14
5.0 GENERAL INSPECTION
14
6.0 GAS LINE & FLUE INSTALLATION
14
7.0 ELECTRICAL INSTALLATION
14
8.0 PROCESS HIGH TEMPERATURE LIMIT
15
Photograph, Process and Combustion High Temperature Limit Switch (PHTL & CHTL)
15
9.0 COMBUSTION HIGH TEMPERATURE LIMIT
16
10.0 NOVATEC GAS FIRED HEATER SEQUENCE OF OPERATION
17
11.0
PROCESS TEMPERATURE ADJUSTMENT
21
12.0
GAS HEATER SETUP PROCEDURES
21
Photograph, Typical Proof of Closure (POC) Switch and Position Indicator
22