2-Axis Scan Head & 3-Axis Scan Head

 

Important Connection Instructions (XY2-100 Interface

 

 

 

 

STEP 1: Connect Power Cable

 

1.

 

Make sure your power supply meets the following requirements

.

 

STEP 2: Connect Galvos

 

Carefully connect the Lightning II galvos to 

their corresponding servo boards using the 

provided galvo cables as shown in Figure 4.

 

Make sure that the X-axis galvo connects to 

X-axis servo, Y-axis galvo connects to Y-axis 

[

and for 3-Axis Scan Head that the Z-axis galvo 

connects to the Z axis

]

Note that the labels on 

the galvo cables match labels on the 

corresponding servo board connectors.

 

 

Make sure that the connectors are firmly 

seated and the two side screws are 

connected securely.

 

A flathead screwdriver may be useful to 

fully engage the screws.

 

 

STEP 3: Apply Power

 

 

 

 

Figure 4

 

Apply power to the scan head. You should see the red LED on each servo board blink 

twice and then flicker at high frequency. The galvos should seek their home positions 

and be ready to follow commands within 5 seconds.

 

 

2.

 

Find the power cable in your shipping package. Connect the color-coded wires of 

the power cable to the power supply as shown at the left side of Figure 1. 

Make sure 

that the GND (White) and 0V (Black) are tied to the Chassis Ground (Green) at the 

power supply end as shown in Figure 1.

 

STEP 4: Verify Proper Grounding

 

Before connecting your controller to the Lightning II scan head, complete the 

following:

 

+48V 

GND 

0V

 

CHASSIS GND

 

 

 

 

 

Power Cable

 

Fan

 

 

Y-Servo 

X-Servo

 

1.

 

With the Lightning II servo boards and your controller powered on, and your 

XY2-100 cable plugged into your controller only, measure the 

voltage difference

 

between the servo chassis ground (A) and your XY2-100 cable DB25 (B) 

connector 

shell. The 

voltage should be less than 0.3V

This verifies that your controller is 

properly grounded to the chassis. If you measure >0.3V, do NOT connect XY2-100 

cable and contact us. See Figure 5.

 

Figure 1

 

3.

 

Connect the daisy-chained power connectors at the other end of the power cable 

to the servo boards and fan in the order shown at the right side of Figure 1. Make 

sure that the first connector in the chain goes to the X-Servo and the last connector 

goes to the fan.

 

(A)

 

Figure 5

 

Corner metal posts 

are chassis ground

 

(B)

 

Figure 5

 

 

 

 

2. Make a power cable with a DB9 female connector based on the pin assignments 

shown below. 

Make sure that the GND (White) and 0V (Black) are tied to the Chassis 

Ground at the power supply end as shown in Figure 2.

 

GND

 

 

 

 

 

B

 

 

Voltage 

difference 

should be

 

<0.3V.

 

 

Figure 5

 

 

2.

 

Turn off the power to the scan head and controller.

 

3.

 

Connect your controller to the XY2-100 interface board via your XY2-100 cable. 

The XY2-100 interface board is at the bottom of the Lightning II servo board stack.

 

Figure 2

 

Figure 3

 

4.

 

Apply power to the scan head and controller.

 

3. Make sure that the servo stack is tied to the system Chassis Ground by one of 

the locations (A) or (B) shown in Figure 3.

 

3-Axis Scan Head

 

+48V 

GND 

0V

 

2-Axis Scan Head

 

Please wear an ESD strap when performing these steps.

 

+48V

 

0V

 

C

U

S

T

O

M

ER

 P

O

W

ER

 

S

UPPL

Y

 

C

U

S

T

O

M

ER

 P

O

W

ER

 

S

UPPL

Y

 

}

 

Lightning

TM 

II Electrical Specifications

 

Input Voltage

 

48 ± 2V DC, Single Power Supply

 

Power Requirements

 

6A Peak, 3A RMS per axis

 

 

 