![Nova Florida LIBRA DUAL BTFS 24 Installation, Use And Maintenance Manual Download Page 4](http://html1.mh-extra.com/html/nova-florida/libra-dual-btfs-24/libra-dual-btfs-24_installation-use-and-maintenance-manual_1710424004.webp)
CONTENTS
General information for the installer, maintenance technicians and users
page
3
1. Instructions for the user
"
5
1.1. Control panel
"
5
1.2. Operating the boiler
"
6
1.2.1. Switching on
"
6
1.2.2.
Operation
"
6
1.2.2.1. AQUA PREMIUM system
"
6
1.2.2.2. Instantaneous DHW production
"
6
1.2.3. Boiler shut-down
"
7
1.2.3.1. Burner shut-down
"
7
1.2.3.2. Shut-down due to overheating
"
7
1.2.3.3. Shut-down due to air/flue gas system malfunction
"
7
1.2.3.4. Shut-down due to low water pressure
"
7
1.2.3.5. Shut-down due to malfunction of temperature probes
"
7
1.3. Maintenance
"
7
1.4. Information for the user
"
7
2. Technical characteristics and dimensions
"
8
2.1. Technical characteristics
"
8
2.2. Dimensions
"
9
2.3. Boiler layout
"
9
2.4. Operational data
"
10
2.5. Technical specifications
"
11
3. Instructions for the fitter
"
12
3.1. Installation standards
"
12
3.2. Installation
"
12
3.2.1.
Packaging
"
12
3.2.2. Choosing where to install the boiler
"
12
3.2.3. Positioning the boiler
"
12
3.2.4. Installing the boiler
"
12
3.2.5. Boiler room ventilation
"
13
3.2.6. Air/flue gas system
"
13
3.2.7. Air/flue gas system configuration
"
14
3.2.8. Air/flue gas system with 100/60 mm diameter coaxial pipes
"
15
3.2.9. Air/flue gas system with 80 mm diameter split pipes
"
15
3.2.10. 80 mm diameter flue gas discharge system
"
16
3.2.11. Installation examples
"
17
3.2.12. Verifying combustion efficiency
"
18
3.2.12.1. “Chimney sweep” function
"
18
3.2.12.2. Combustion efficiency verification procedure
"
18
3.2.13. Gas mains connection
"
18
3.2.14. Power mains connection
"
19
3.2.15. Room thermostat connection
"
19
3.2.16. Hydraulic connections
"
19
3.2.17. Remote control board installation (optional equipment)
"
19
3.2.18. External probe installation (optional equipment)
"
20
3.2.19. Phone operation device connection (optional equipment)
"
20
3.2.20. Adjustable by-pass
"
21
3.3. Loading the system
"
21
3.4. Starting the boiler
"
21
3.4.1. Preliminary checks
"
21
3.4.2. On/off switching
"
21
3.5. Wiring diagram
"
22
3.6. Switching to different gas and burner adjustment
"
23
4. Testing the boiler
"
24
4.1. Preliminary checks
"
24
4.2. On/off switching
"
24
5. Maintenance
"
24
6. Troubleshooting
"
25
4