5 - MAINTENANCE
5-37
SERVICE PROCEDURE:
Assembly
(Rolling Spiral Basket & Spring
Cage Roller)
:
1. Although the rear attachment differs from one to the other,
the installation in the following steps are the same with
the exception of the length of the bolt.
2. Apply grease to the
Hub
A
spindle with multi purpose
grease before assembling the
Hub
A
to the
Spring
Roller Weldment D
and secure with the
1/2”-13 X 7”
Bolt B
and
1/2”-13 Nylock Nut
C
. Repeat for the
C
D
B
A
Fig. # 5-63 Install Hub To Spring Roller
3. Position Spring Roller assembly parallel to machine as
shown.
Fig. # 5-64 Installing Spring Roller
NOTE
The following steps may not need to be performed if the
rear attachment has sufficient clearance.
4. Install rear attachment, by spreading the side roller plate
with a pry bar as shown.
Use Pry Bar
Against Here
Align Holes
Pry Bar
Fig. # 5-65 Prying Spring Roller Into Position
Align Holes
Use Pry Bar
Against Here
Pry Bar
Fig. # 5-66 Prying Rolling Spiral Basket Into Position
Summary of Contents for Kwik-Till HSD2500
Page 2: ......
Page 10: ...1 4 1 GENERAL INFORMATION This Page Is Intentionally Left Blank...
Page 91: ...4 WORKING OPERATIONS 4 25 Fig 4 69 3 Rear Roller Deflector Locations A A...
Page 92: ...4 WORKING OPERATIONS 4 26 This Page Is Intentionally Left Blank...
Page 134: ...5 MAINTENANCE 5 42 This Page Is Intentionally Left Blank...
Page 144: ...8 FORMS AND DECLARATIONS 8 2 This Page Is Intentionally Left Blank...
Page 152: ...i 6...
Page 153: ......