4
Unpacking
6.)
Raise the boom to the full upright position by pulling lever #3. The trencher will now have its weight on wheels and
tow bar. Turn the engine off.
7.)
Install the up-down and sided-to-side travel pins that were removed earlier. Relieve system pressure by pushing
lever #3. This will make the boom drop until it rests on the up-down travel pin.
8.)
Insert outriggers in the vertical brackets above the newly installed wheels. Lock the outriggers in the vertical position
with the pins and pin clips provided.
fig01384
2
1
3
4
9.)
Roll the trencher away from the remaining packaging materials
.