![North Star M165601M.1 Owner'S Manual Download Page 16](http://html1.mh-extra.com/html/north-star/m165601m-1/m165601m-1_owners-manual_1707889016.webp)
Installation / Initial Set-Up
16
There are a number of important steps required to set up your generator for initial use. These
steps are:
Steps for Installation / Initial Set-Up
1.
Unpacking & delivery inspection.
2.
Planning the power load to stay within the generator’s rated
capacity.
3.
Setting up generator for the type of power generation you need:
a.
portable power source, or
b.
connected to a building as a back-up power source.
4.
Selecting a site for using the generator.
5.
Grounding.
6.
Battery installation (electric start models only).
Each of these steps is discussed in detail below:
1. Unpacking & Delivery Inspection
You should inspect the generator immediately after you receive delivery.
See the “Machine Component Identification” section of this manual for a
diagram of the generator and its components.
If you have missing or
damaged
components, contact Product Support at 1-800-270-0810.
2. Planning the Power Load
Plan your power load so that you do not exceed the generator’s rated capacity.
See the “Power Load Planning & Management” section of this manual to review how to plan and
manage power loads for the generator.
Summary of Contents for M165601M.1
Page 2: ...Hazard Signal Word Definitions 2...
Page 43: ...Generator Exploded View Rev P 5 Item s 165601 165603 165604 43...
Page 45: ...Generator Exploded View Rev P 5 Item s 165605 165606 165607 45...
Page 47: ...Control Panel Parts List Rev P 5 47 Item 165601 Item 165603 Item 165604...
Page 48: ...Control Panel Parts List Rev P 5 48 Item 165605 Item 165606 Item 165607...
Page 50: ...Generator Head Exploded Views Rev P 5 Item s 165601 165603 165604 165605 50...
Page 52: ...Generator Head Exploded Views Rev P 5 Item s 165606 165607 52...
Page 54: ...54 This page has intentionally been left blank...
Page 56: ...56 Assembled by Northern Tool Equipment Company Inc Burnsville MN 55306 NorthernTool com...