Page 172 of 378
Install and configure ITG ISL Trunk node
553-3001-202
Standard 1.00
April 2000
Meridian 1 Small System cable installation (Option 11C and
Option 11C Mini)
1
Set the switches and jumper plugs in the NTAK02 SDI/DCH card as
shown. See Tables 29 and 30.
2
Connect the NTAK19FB Quad Serial I/O SDI/DCH Cable (or
equivalent) to the I/O connector for the card slot in which the SDI/DCH
card is installed.
3
If the DCHIP card is installed in the main cabinet with the SDI/DCH
card then use NTWE04AD SDI/DCH Extension Cable (1 ft.) from the
NTCW84KA DCH (P5) connector to the NTAK19FB D-Channel port
connector for Port 1 or Port 3.
Table 29
NTAK02 SDI/DCH switch settings for ITG ISL Trunk DCHIP
Port 1
SW 1-1
SW 1-2
DCH
OFF
OFF
Port 3
SW 1-3
SW 1-4
DCH
OFF
OFF
Table 30
NTAK02 SDI/DCH jumper settings for ITG ISL Trunk DCHIP
Port
Jumper
location
Strap
for
DTE
Jumper
location
RS422
Port 1
J7
C - B
J9
C - B
J6
C - B
J8
C - B
Port 3
J4
C - B
J2
C - B
J3
C - B
J1
C - B
Summary of Contents for ISDN Signaling Link
Page 2: ......
Page 4: ...Page 4 of 378 553 3001 202 Standard 1 00 April 2000...
Page 16: ...Page 16 of 378 Contents 553 3001 202 Standard 1 00 April 2000...
Page 18: ...Page 18 of 378 About this guide 553 3001 202 Standard 1 00 April 2000...
Page 378: ...Page 378 of 378 Index 553 3001 202 Standard 1 00 April 2000...
Page 379: ......