Installing the Nortel Ethernet Routing Switch 5500 Series on a table or shelf
21
Attaching the rubber footpads
2
Set the switch on a table or shelf as illustrated in
Routing Switch on a desk or shelf" (page 21)
. Allow at least 2 inches
(5.1 centimeters) on each side for proper ventilation and at least 5
inches (12.7 centimeters) at the back for power cord clearance.
Nortel Ethernet Routing Switch on a desk or shelf
—End—
Nortel Ethernet Routing Switch 5500 Series
Installation
NN47200-300
2.00
Standard
5.0
7 July 2006
Copyright © 2005 - 2006, Nortel Networks
Nortel Networks Confidential
.