![Nortel 2000 Hardware Installation Manual Download Page 10](http://html1.mh-extra.com/html/nortel/2000/2000_hardware-installation-manual_1706151010.webp)
Chapter 1
Application Gateway Overview
Power
2
Application Gateway Hardware Installation Guide
Power
The power cord connector is located on the left side on the back of the
Application Gateway. When the power LED, on the front panel, is
illuminated, the power is on.The power control button is on the front
panel. The power supplies are factory installed and not customer
replaceable.
Attention:
This server is suitable for use on an IT power distribution
system, whose maximum phase to phase voltage is 240 V under any
distribution fault condition.
Connectors
The following topics describe the Application Gateway connectors:
•
Front Controls, LEDs, and CD Drive, page 2
•
Back Connectors, page 4
Front Controls, LEDs, and CD Drive
Figure 1
shows the front of the Application Gateway.
Figure 1
Application Gateway Front Controls, LEDs, and CD Drive