background image

3

air conditioner inStallation

general information

The S6BF series air conditioner is designed only for 

outdoor rooftop or ground level installations. This unit 

has been tested for capacity and efficiency in accordance 

with AHRI Standards and will provide many years of safe 

and dependable comfort, providing it is properly installed 

and maintained. Abuse, improper use, and/or improper 

maintenance can shorten the life of the appliance and 

create unsafe hazards.
To achieve optimum performance and minimize equipment 

failure, it is recommended that periodic maintenance be 

performed on this unit. The ability to properly perform 

maintenance on this equipment requires certain 

mechanical skills and tools.

Before you install this unit

  The cooling load of the area to be conditioned must be 

calculated and a system of the proper capacity selected. 

It is recommended that the area to be conditioned be 

completely insulated and vapor sealed.

  Check the electrical supply and verify the power supply 

is adequate for unit operation. The system must be wired 

and provided with circuit protection in accordance with 

local building codes. If there is any question concerning 

the power supply, contact the local power company.

  The indoor section (air handler, furnace, etc) should be 

installed before routing the refrigerant tubing. Refer to 

the indoor unit's installation instructions for installation 

details.

  All units are securely packed at the time of shipment and 

upon arrival should be carefully inspected for damage 

prior to installing the equipment at the job site. Verify 

coil fins are straight. If necessary, comb fins to remove 

flattened or bent fins. Claims for damage (apparent or 

concealed) should be filed immediately with the carrier.

  Please consult your dealer for maintenance information 

and availability of maintenance contracts. Please read 
all instructions before installing the unit.

locating the air conditioner

•  Survey the job site to determine the best location for 

mounting the outdoor unit.

•  Sufficient clearance for unobstructed airflow through the 

outdoor coil must be maintained in order to achieve rated 

performance. See 

Figure 1

 for minimum clearances to 

obstructions.

•  Overhead  obstructions  (

Figure 1

), poorly ventilated 

areas, and areas subject to accumulation of debris 

should be avoided.

•  Consideration should be given to availability of electric 

power, service access, noise, and shade.

packaging removal

note:  To prevent damage to the tubing connections, 

carefully remove the carton and user’s manual from the 

equipment. Discard the shipping carton.

ground level

Ground level installations must be located according to 

local building codes or ordinances and these requirements:

•  Clearances must be in accordance with those shown 

in 

Figure 1

.

•  A suitable mounting pad (

Figure 1

) must be provided 

and separate from the building foundation. The pad 

must be level and strong enough to support the weight 

of the unit. The slab height must be a minimum of 2” (5 

cm) above grade and with adequate drainage.

roof mount

•  The method of mounting should be designed so that it 

does not overload roof structures or transmit noise to 

the interior of the structure. The roof must be structurally 

capable of handling the weight of the unit.

•  Full  perimeter  support  is  required  under  the  unit. 

Support must be made of weather resistant materials 

and installed prior to unit installation.

•  The support must be built to raise the unit 6" above the 

roof.

Figure 1

Figure 1. clearance requirements

2” Mounting Pad

24" for 

Service Access

12" or 18”

See Note

12" or 18”

See Note

DO NOT

OBSTRUCT

TOP OF UNIT

NOTE: Units require full perimeter clearances.

Installer must maintain 18” between two units

or 12” between single unit and structure.

6” from Building

or Structure

48”

Summary of Contents for S6BF-024 Series

Page 1: ...allation Return these instructions to the customer s package for future reference DO NOT DESTROY PLEASE READ CAREFULLY KEEP IN A SAFE PLACE FOR FUTURE REFERENCE important SAFETY INFORMATION 2 Air cond...

Page 2: ...below must be followed during the installation service and operation of this unit Unqualified individuals should not attempt to interpret these instructions or install this equipment Failure to follow...

Page 3: ...nanceinformation and availability of maintenance contracts Please read all instructions before installing the unit Locating the Air Conditioner Survey the job site to determine the best location for m...

Page 4: ...rical connections in accordance with all applicable codes and ordinances Overcurrent protection must be provided at the branch circuit distribution panel and sized as shown on the unit rating label an...

Page 5: ...The thermostat should be mounted about 5 feet above theflooronaninsidewall DONOTinstallthethermostat on an outside wall or any other location where its operationmaybeadverselyaffectedbyradiantheatfrom...

Page 6: ...the system Add refrigerant and repeat Steps 1 through 3 until the system is correctly charged System Cooling 1 Set the thermostat s system mode to COOL and the fan mode to AUTO Gradually lower the the...

Page 7: ...sig Liquid Temperature F S6BF 024K Charging Chart Cooling Add refrigerant when below curve Remove refrigerant when above curve Figure 2 Before using these charts make sure the unit is in a stable oper...

Page 8: ...S6BF 030K Charging Chart Cooling Add refrigerant when below curve Remove refrigerant when above curve Figure 4 200 220 240 260 280 300 320 340 360 380 400 420 440 460 480 500 520 540 560 580 600 75 80...

Page 9: ...S6BF 042K Charging Chart Cooling Add refrigerant when below curve Remove refrigerant when above curve Figure 6 200 220 240 260 280 300 320 340 360 380 400 420 440 460 480 500 520 540 560 580 600 75 80...

Page 10: ...L2 OUTDOOR FAN MOTOR C S DUAL CAPACITOR R 3 1 2 START CAPAC START RELAY BLACK BLUE ORANGE YELLOW CONTACTOR YELLOW BLACK RED CRANKCASE HEATER OPTIONAL YELLOW BLACK SEE NOTE 6 RED OR YELLOW BLACK RED O...

Page 11: ...ction see unit rating plate 6 Connect to 24 vac 40va class 2 circuit See furnace air handler installation instructions for control circuit and optional relay transformer kits 7 Anti Short Cycle Timer...

Page 12: ...___________ Unit Installed Minimum clearances shown on page 3 YES NO Has the owner s information been reviewed with the customer YES NO Has the Literature Package been left with the unit YES NO REFRIG...

Reviews: