49
After installing the condensate drain piping
• Make sure that there are no obstructions blocking
the condensate drain line from discharging
condensate.
• Be sure to check that condensate is freely flowing
from the condensate drain piping.
Condensate will begin flowing out of the Combi
Boiler
within 15 minutes after operation has
started
.
Freeze prevention
Take measures to prevent the condensate drain
lines from freezing (insulation, heat tape, electric
heaters, etc.).
Drain pipe
Drain connecting
supply
Heat insulation
material
[If an external neutralizer is installed]
Periodic replacement of the neutralizing agent will
be required.
Refer to the instructions supplied with the
neutralizer for suggested replacement intervals.
Floor drain
Connecting the Condensate Drain