Nordyne P6 Series /installation User Manual Download Page 5

5

24 9/10

13 1/2

16

12

13 3/10

13 1/2

16

12

CG

A

47 1/2

3/4" NPT Female
Drain Connector

B

DOWNFLOW

SUPPLY DUCT

OPENING

DOWNFLOW

RETURN DUCT

OPENING

23 1/2

Top View

Side View

Back View

Figure 2. Dimensions

1.25 Ø Power Entry

1.75 Ø Power Entry (Capped)

0.88 Ø Control Wiring Entry

23.6

27.2

30.0

1.8

4.00

13.5

16.0

14.7

13.5

16.0

13.45

11.75

22.75

55.8

C

SUPPLY

RETURN

4.0

CONDENSING

COIL

5.0

8

Center of Gravity

Height (in inches)

C

Model No.

Unit

A

B

P6SD

Weight

with base rails

without base rails

X36

405

29.5

26.0

39.0

35.3

X48

415

29.5

26.5

39.0

35.3

X60

480

30.0

27.5

43.0 39.3

Summary of Contents for P6 Series /installation

Page 1: ...censed installation service personnel for this type equipment All installations must be in accordance with these instructions and with all applicable national and local codes and standards Read these...

Page 2: ...UNIT INSTALLATION 7 Ground Level 7 Rigging and Hoisting 7 Rooftop 8 AIR SUPPLY 8 Unconditioned Spaces 9 Acoustical Ductwork 9 Horizontal to Down Flow Conversion 9 Clearance 9 ELECTRICAL WIRING 9 Gener...

Page 3: ...Let it control the operation of the air conditioning system If you get chilly turn it up a degree at a time until comfort is restored 3 It takes longer for an air conditioner to cool your dwelling tha...

Page 4: ...Code ANSI NFPA 70 or in Canada the Canadian Electric Code Part 1 CSA C 22 1 Air Ducts must be installed in accordance with the standards of the National Fire Protection Association Standards for Inst...

Page 5: ...gure 2 Dimensions 1 25 Power Entry 1 75 Power Entry Capped 0 88 Control Wiring Entry 23 6 27 2 30 0 1 8 4 00 13 5 16 0 14 7 13 5 16 0 13 45 11 75 22 75 55 8 C SUPPLY RETURN 4 0 CONDENSING COIL 5 0 8 C...

Page 6: ...tor coil of this unit All return air to this unit must pass NFPA publications are available by writing National Fire Protection Association Batterymarch Park Quincy Maine 02269 Unit Location This air...

Page 7: ...Refer to local codes and restrictions for proper condensate disposal requirements UNIT INSTALLATION Ground Level When installing the unit at ground level provide a concrete mounting pad separate from...

Page 8: ...Reinforce the roof if required AIR DUCTS This unit is designed only for use with a supply and return duct Air ducts should be installed in accordance with the standards of the National Fire Protectio...

Page 9: ...and with the current revision of the National Electric Code NFPA 70 or in Canada CSA C 22 1 Canadian Electrical CodePart1 Ifanyoftheoriginalwireassupplied with the unit must be replaced it must be re...

Page 10: ...heorangewirecontrols cooling operation while the red wire controls heating operation 3 Verify the required speed from the airflow data found in table 1 Place appropriate wire on the appropriate motor...

Page 11: ...for 1 Stage Cool 1 Stage Heat Typical Wiring Field Supplied for 2 Stage Cool 2 Stage Heat with an Optional Outdoor Thermostat Figure 8 Typical Air Conditioner Thermostat Connections R Y1 Y2 C G 1 2 3...

Page 12: ...r delivery at the register s Ensurethattherearenoobstructions attheregistersorintheductwork Setthermostat fan switch to Auto System Cooling 1 Set the thermostat system switch to Cool and the thermosta...

Page 13: ...ers as necessary using a mild detergentandwater Rinsethoroughly with water 3 Inspect the electrical connections for tightness at the beginning of each heating and cooling season Service as necessary I...

Page 14: ...p T1 1515 1450 1380 1350 1280 1250 1200 1160 Tap T2 1580 1520 1460 1400 1300 1280 1260 1230 X60 Tap T3 1740 1690 1650 1600 1360 1500 1460 1390 Tap T4 1960 1910 1840 1820 1540 1740 1700 1600 Tap T5 209...

Page 15: ...uid Temperature F Liquid Pressure psig Add refrigerant when below curve Remove refrigerant when above curve P6SD X60 Charging Chart Cooling 200 220 240 260 280 300 320 340 360 380 400 420 440 460 480...

Page 16: ...RED RED RED RED ORANGE ORANGE ORANGE ORANGE ORANGE BLACK BLACK BLACK BLACK BLACK BLACK BLUE BROWN YELLOW YELLOW BLACK BLACK BK 208 230 Volt z H 0 6 e s a h P e e r h T r e n o i t i d n o C r i A d e...

Page 17: ...NOTES 1 Disconnect all power before servicing 2 For supply connections use copper conductors only 3 Not suitable on systems that exceed 150V to ground 4 If any of the original wire as supplied with th...

Page 18: ...H 0 6 e s a h P e l g n i S r e n o i t i d n o C r i A d e g a k c a P e l b i t r e v n o C NOTES 1 Disconnect all power before servicing 2 For supply connections use copper conductors only 3 Not su...

Page 19: ...E RED ORANGE BLUE YELLOW BLACK RED RED RED RED GREEN GRAY BLUE YELLOW BLACK GRAY GREEN RED BLACK ORANGE GN YE STRIPE BLUE WHITE GREEN BLACK RED RED GREEN NOTES FIELD WIRING LEGEND LOW VOLTAGE HIGH VOL...

Page 20: ...7089330 7089330 Specifications and illustrations subject to change without notice and without incurring obligations 10 08 O Fallon MO INSTALLER PLEASE LEAVE THESE INSTALLATION INSTRUCTIONS WITH THE H...

Reviews: