Page 8
INSTALLATION PROCESS
A—BASE PLATES INSTALLATION
Please refer to the diagram (Figure 1) to mark the position of base plates
The measurement is from center to center of plates. Referring to the diagram and confirm the place
of base plates. ENSURE THAT THE FOUNDATION IS SQUARE.
1.
The Stake Peg (No.18) and Earth Auger (No. 18A) applies for normal ground and grassland.
2.
The Expansion Bolt (No.18B) applies for concrete and hard ground.
Summary of Contents for SST304716
Page 1: ...Page 1 Double Truss Shelter Model SST304716 W9 14xL14 2xH4 88m Assembly Instructions ...
Page 9: ...Page 9 Figure 1 ...
Page 14: ...Page 14 Figure 6 ...
Page 16: ...Page 16 ROOF COVER INSTALLATION Figure 7 ...
Page 17: ...Page 17 FRONT COVER AND MECHANICAL DOOR INSTALLATION Figure 8 ...
Page 18: ...Page 18 MECHANICAL DOOR INSTALLATION Figure 9 ...