background image

 

 

Page  8 

INSTALLATION PROCESS 

 
A—BASE PLATES INSTALLATION 

Please refer to the diagram (Figure 1) to mark the position of base plates 
The measurement is from center to center of plates. Referring to the diagram and confirm the place 
of base plates. ENSURE THAT THE FOUNDATION IS SQUARE. 
1.

 

The Stake Peg (No.18) and Earth Auger (No. 18A) applies for normal ground and grassland. 

2.

 

The Expansion Bolt (No.18B) applies for concrete and hard ground. 

 

Summary of Contents for SST304716

Page 1: ...Page 1 Double Truss Shelter Model SST304716 W9 14xL14 2xH4 88m Assembly Instructions ...

Page 2: ...Page 2 RECOMMENDED TOOLS Equipment List Speed Wrench 22 23 24 Hammer 30lb Rope 12 Long Tape 50m Hammer Drill 1 Lifter 2 Crane 1 Forklift 1 Protective equipment ...

Page 3: ...chor the shelter properly will void the manufacturer s warranty and may cause serious injury and damage LOCATION Choosing the proper location is an important step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best location Never erect the structure under power lines Identify whether underground cab...

Page 4: ...or back end left 1 A 2C Upper Truss Arch for back end right 1 A 3 Shoulder Bent Truss Arch for middle 12 A 3A Shoulder Bent Truss Arch for front and back end with connection plate 4 A 4 Purlin between Arch No 1 2 11 B 4A Purlin between Arch No 2 to 6 55 B 4B Purlin between Arch No 6 7 11 B 5 Bracing Tube 12 B 6 Base Plate for four corners 4 A 7 Base Plate for middle 12 A 8 Tensioning Tube for Roof...

Page 5: ...Cover 1 bundle A 16 Cable Tie for Roof Cover 70 A 17 Belt for winch No 14 16 A 18 Stake Peg normal conditions 48 A 18A Earth Auger with its tool normal conditions 16 A 18B Expansion Bolt concrete ground 64 B Back End Panel 19 Portal for back end 2pcs set 2 sets B 20 Short Vertical Bar for back end 1 B 21 Door Cross Beam for back end 2pcs set 1 set B 22 Rail for back end 4 B 23 Back Cover 1 B 23A T...

Page 6: ...d Panel 30 Portal for front end right 2pcs set 1 set A 30A Portal for front end left 2pcs set 1 set A 31 Portal for front end 1 A 32 Rail for front end 2pcs set 1 set B 33 Rail for front end 4 B 34 Front Cover with door cover 1 B 35 Door Bolt 2 B 36 Connection Plate for portal No 30 30A 4 A 37 Winch with bolt for front door 1 set A 38 Tube in door cover 2pcs set 6 sets B 39 Bolt M8x120 for square ...

Page 7: ... with its tool normal conditions 2 A 43B Expansion Bolt concrete ground 8 B 44 Steel Wire for front door 1 bundle B 44A Steel Wire rope clip for front door 4 B 45 Door Track for front door 2pcs set 2 sets B 46 Bracket for Winch No 37 1 A 47 Self drilling bolt and its tool for door track No 45 28 4 B 48 Tape for door tube No 23A 38 1 B ...

Page 8: ...of base plates The measurement is from center to center of plates Referring to the diagram and confirm the place of base plates ENSURE THAT THE FOUNDATION IS SQUARE 1 The Stake Peg No 18 and Earth Auger No 18A applies for normal ground and grassland 2 The Expansion Bolt No 18B applies for concrete and hard ground ...

Page 9: ...Page 9 Figure 1 ...

Page 10: ...h No 1 to 8 1 Find Truss Arches for front end No 1A 2B 3A and Base Plate No 6 for Arch No 1 and connect them by Bolt M8x60 No 12 2 Find relative parts of rails and portals for front end and assemble them referring to Figure 2 Figure 2 ...

Page 11: ...Page 11 3 Find Truss Arches No 1 2 3 for Arch No 2 to 7 and connect them by Bolt M8x60 No 12 Please refer to Figure 3 for details Figure 3 ...

Page 12: ... Truss Arches for front end No 1A 2A 3A and Base Plate No 6 for Arch No 8 and connect them by Bolt M8x60 No 12 5 Find relative parts of rails and portals for back end and assemble them referring to Figure 4 Figure 4 ...

Page 13: ...install Purlin No 4 Connect purlins by Bolt M8x50 No 13A and connect them to arch by Bolt M8x100 No 13 and then go to Arch No 3 to No 7 and Purlins No 4A 4B one arch and purlin tubes in turns Please refer to Figure 5 and Figure 6 8 Install Bracing Tube No 5 between arches by Tube Clip No 10 Figure 5 ...

Page 14: ...Page 14 Figure 6 ...

Page 15: ...quare and evenly centered on the frame Note The end flaps must overhang evenly at both ends 3 Use Cable Tie No 16 to fix roof cover to end arches first Then use the supplied Knitting Rope No 15 to tighten the roof cover to the end arches The rope should be cut as your requirements when using The recommended procedure is to use separate pieces of rope and start by first lacing the cover from the bo...

Page 16: ...Page 16 ROOF COVER INSTALLATION Figure 7 ...

Page 17: ...Page 17 FRONT COVER AND MECHANICAL DOOR INSTALLATION Figure 8 ...

Page 18: ...Page 18 MECHANICAL DOOR INSTALLATION Figure 9 ...

Page 19: ...Page 19 BACK COVER AND PULL EASE ROLL UP DOOR INSTALLATION Now your assembly is completed Figure 10 ...

Reviews: