16
50
3
72
8
35 62
Slot
33. Attach a 4” Pulley (35) over the Low Cable (72),
inside the front leg of the Base (8) with a 3/8” x
2 1/2” Bolt (54), two 3/8” Washers (55), two 5/8” x
1/2” Bushings (42), and a 3/8” Nylon Jamnut (63).
34. Route the Low Cable (72) through the indicated
slot in the Main Upright (3) and the Base (8).
Wrap the Low Cable (72) around a 4” Pulley (35)
in the direction shown. Attach the Pulley inside
the bracket on the Main Upright (3) with a 3/8” x
2” Bolt (62) and a 3/8” Nylon Locknut (50).
35. Wrap the Low Cable (72) over a 4” Pulley (35).
Slide the Pulley and a Cable Trap (44) between the
two Pulley Plates (31).
Make sure the Cable is in
the groove of the Pulley and that the Cable Trap
is oriented so it will hold the Cable in place.
Attach the 4” Pulley (35) and the Cable Trap (44)
to the third set of holes from the bottom of the
Pulley Plates (31) with a 3/8” x 1 3/4” Bolt (60)
and a 3/8” Nylon Jamnut (63).
34
33
63
54
8
42
42
55
55
72
35
Bracket
31
35
72
35
44
60
63
36. Wrap the Low Cable (72) around a 4” Pulley (35).
Attach the Pulley inside the bracket on the Main
Upright (3) with a 3/8” x 2” Bolt (62) and a 3/8”
Nylon Locknut (50).
36
3
50
72
62
35