
Upgrade Kit Components
1 - Installation Instructions
1 - Burner Box Gasket
3 - #8 Hex SD Screws
4 - Screws (#6 x 3/8")
2 - Metal Screw (#6 x 1 1/4")
1 - 6" Red Wire w/3" Jumper
1 - 6" Yellow Wire
1 - 7" Red Wire
1 - Spade Terminal Connector (Double 45)
1 - #11 Burner Orifice (Red Dot)
1 - Burner Heat Shield
1 - 1.0 AMP Fuse
1 - 1.0 AMP Fuse Label
1 - DC Fuse Holder
1 - Plastic Fuse Cover
1 - 12 Volt DC Fan (With Brackets and wire extensions)
1 - 12 Volt DC Thermostat (Fan)
1 - 20" Red Wire
1 - Exhaust Flexible Vent Tube w/Insulation
1 - Wiring Diagram Label
Tools Required
1 - Pliers
1 - Tin Snips
1 - Screw Gun with Phillips Head or Phillips Screwdriver
1 - 1/4" Hex Head Driver
1 - Volt Ohmmeter
1 - 7/16" Open End-Wrench
1 - 1/2" Open End-Wrench
1 - 5/8" Open End-Wrench
1 - Manometer
1 - 3/8" Power Drill
1 - 3/32" Drill Bit
1 - 1/16" Drill Bit
Specifications
Installation of the upgrade kit will change the rating specifications for the LP gas mode. The
specifications are as follows:
LP Gas Mode: 925 BTU/Hr. input; 11" W.C. Gas Supply; .011" Orifice (LP11)
Time Allowance
The time allotted to upgrade the refrigerator is 2.0 hours. The allotted time is to be multiplied
by the service facility prevailing shop labor rate. The time allowance includes diagnostic times,
upgrade kit installation, refrigerator removal and re-installation, and gas leak test.
NOTE: A gas leak test is required when gas connections, either the main supply line or
the refrigerator gas components, have been disconnected.
2
Summary of Contents for 3163G
Page 2: ......
Page 3: ...Figure 1 Before Upgrade Figure 2 After Upgrade 1...