background image

 

 7 

3  

HYDRAULIC INSTALLATION 

  

WARNING! 

The  hydraulic  system  creates  very  high 
pressure.    Before  disconnecting  any 
hydraulic  lines  ensure  all  pressure  has 
been bled from the system.  

 

IMPORTANT:  

Component 

failure 

due 

to 

oil 

contamination  is  not  covered  under  the 
UC4+  Spray  Height  Control  system 
warranty.    It  is  recommended  that  a 
qualified  technician  does  the  hydraulic 
installation.  

 

Sprayers  with  a  model  year  of 

2007 and older require the main lift valve 
to  be  changed.    See  Section  4  for 
instructions on how to do this.

 

1.

 

Use 

Figure  1

  as  a  reference  for 

installing the hydraulics. 

2.

 

On  a  clean  surface  remove  all  plastic 
plugs from the NORAC expansion valve 
block (

V01

). 

3.

 

Install the 6MB 6MOR fitting (

F04

) into 

the A and B ports of the expansion block 
(

Figure 2

). 

 

Figure 2 - Third station expansion block 

assembly 

4.

 

Remove the three 4MBP plugs from the 
UC4+ 2 station valve block. 

5.

 

Coat  the  three  o-rings  in  hydraulic  oil 
and  install  them  into  the  expansion 
block.   

  Make sure the o-rings are properly 

seated. 

 

Figure 3 - Expansion Valve O-Ring 

Placement 

6.

 

Thread  the  4.5”  studs  into  the  UC4+ 
block. 

 

Figure 4 - Expansion Valve Stud 

Insertion

 

Summary of Contents for UC4+ Case 44 Series

Page 1: ...Case 44 Series Main Lift Option Installation Manual 3 bolt Spray Height Controller Improving the competitiveness of Industry and Agriculture through Precision Measurement ...

Page 2: ...ystems International Inc reserves the right to improve products and their specifications without notice and without the requirement to update products sold previously Every effort has been made to ensure the accuracy of the information contained in this manual The technical information in this manual was reviewed at the time of approval for publication ...

Page 3: ... 3 3 HYDRAULIC INSTALLATION 7 4 MAIN LIFT VALVE INSTALLATION 9 5 ELECTRICAL INSTALLATION 10 6 COMPLETING THE INSTALLATION 11 7 ELECTRICAL REFERENCE CABLE DRAWINGS 12 7 1 ITEM C01 44658 62 CABLE 12 7 2 ITEM C02 44658 46D CABLE VALVE DT WITH PIGTAIL 13 ...

Page 4: ... the information given below Phone 1 800 667 3921 Canada Toll Free 1 866 306 6722 United States Toll Free 33 06 03 87 80 78 Europe 1 306 664 6711 all other regions E mail service norac ca Website www norac ca NOTICE Every effort has been made to ensure the accuracy of the information contained in this manual All parts supplied are selected specially to fit the sprayer to facilitate a complete inst...

Page 5: ...ur installation Table 1 UC4 Spray Height Control System Parts Rev A Item Part Number Name Quantity C01 44658 62 CABLE VALVE CS4 INTERFACE 1 C02 44658 46D CABLE VALVE DT ROLL WITH PIGTAIL 1 H01 44865 48 HYDRAULICS FITTING KIT CS4 1 H02 44863 38 HOSE ASSEMBLY 122R2 06 156 IN L 6FORX 6FORX90 2 M01 UC4 CS4 3B INST MANUAL INSTALLATION UC4 CASE 44 SERIES MAIN LIFT KIT 44952D 1 V01 44952D VALVE ASSEMBLY ...

Page 6: ...NGLE SWIVEL TYPE GENDER SIZE TYPE B ORB J JIC OR FLAT FACE P PIPE Fitting Name Example The use of dielectric grease is not recommended on any NORAC electrical connections To ensure all stainless steel hardware does not gall or seize apply a light coating of the supplied Permatex Anti seize grease to all threaded parts upon installation Permatex Anti seize lubricant is preferred but other similar a...

Page 7: ...6 Figure 1 Hydraulic Components ...

Page 8: ...anged See Section 4 for instructions on how to do this 1 Use Figure 1 as a reference for installing the hydraulics 2 On a clean surface remove all plastic plugs from the NORAC expansion valve block V01 3 Install the 6MB 6MOR fitting F04 into the A and B ports of the expansion block Figure 2 Figure 2 Third station expansion block assembly 4 Remove the three 4MBP plugs from the UC4 2 station valve b...

Page 9: ... 6 12 Connect the NORAC hose H02 that is connected to the B port on the NORAC expansion block to the tee fitting F03 13 Reconnect the hose that runs from the Case main lift valve block to the main lift tee This connects onto the tee fitting F03 14 Disconnect the lower hose that runs from the Case valve block to the main lift tee 15 Connect the NORAC hose H02 that is connected to the A port on the ...

Page 10: ...7558232 1 Lower the main lift all the way to the bottom 2 Turn OFF the sprayer ignition 3 Loosen the hoses on each side of one of the main lift cylinders located at the back of the sprayer This is to remove any pressure from the system 4 Remove the coils from the main lift valve located under the sprayer Figure 7 Main Lift Valve Location 5 Thread the valve out of the valve housing and thread the n...

Page 11: ...ropriate connections on cable C02 4 Connect the three pin tower on cable C02 to the free three pin shroud on the valve extension cable 5 Connect cable C01 to the three pin shroud on cable C02 6 Connect the 2 pin connector on cable C01 marked ROLL CW to the coil on the port side of the valve block The port side is the side of the valve block with the left and right tilt hoses 7 Connect the 2 pin co...

Page 12: ...STALLATION You can now continue to install the remainder of your UC4 Spray Height Control System If the system is fully installed then refer to the UC4 Operators Manual to run an Automatic Install with the CS4 type selected ...

Page 13: ...12 7 ELECTRICAL REFERENCE CABLE DRAWINGS 7 1 ITEM C01 44658 62 CABLE ...

Page 14: ...7 2 ITEM C02 44658 46D CABLE VALVE DT WITH PIGTAIL ...

Page 15: ...DDRESS 3702 Kinnear Place Saskatoon SK S7P 0A6 United States Norac Inc CALL TOLL FREE 1 866 306 6722 763 786 3080 SHIPPING ADDRESS 1290 Osborne Rd NE Suite F Fridley MN 55432 2892 Europe NORAC Europe sarl 33 06 03 87 80 78 SHIPPING ADDRESS Rue de l hermitage 01090 Guereins France www norac ca ...

Reviews: