•
An external power supply is needed.
•
Supply 12V DC from an external power supply to CU-4 to power up the phone.
•
The phone must be connected to a CU-4 control unit with a product-specific flash adapter.
Steps
1.
Place the phone to the docking station adapter (CU-4 is connected to the adapter).
2.
Start
Phoenix
service software.
3.
Choose File
→
Scan Product.
4.
Choose Tuning
→
Energy Management Calibration.
5.
To show the current values in the phone memory, click Read, and check that communication between
the phone and CU-4 works.
6.
Check that the CU-4 used check box is checked.
7.
Select the item(s) to be calibrated.
Note:
ADC calibration has to be performed before other item(s). However, if all calibrations are
selected at the same time, there is no need to perform the ADC calibration first.
8.
Click Calibrate.
The calibration of the selected item(s) is carried out automatically.
The candidates for the new calibration values are shown in the
Calculated values
column. If the new
calibration values seem to be acceptable (please refer to the following "Calibration value limits" table),
click Write to store the new calibration values to the phone permanent memory.
Table 9 Calibration value limits
Parameter
Min.
Max.
ADC Offset
-30
+40
ADC Gain
12000
14000
BSI Gain
1100
1350
VBAT Offset
2635
2755
VBAT Gain
14900
15900
VCHAR Gain
N/A
N/A
IBAT (ICal) Gain
7750
12250
9.
Click Read, and confirm that the new calibration values are stored in the phone memory correctly. If the
values are not stored to the phone memory, click Write and/or repeat the procedure again.
10. To end the procedure, close the
Energy Management Calibration
window.
RM-609
BB Troubleshooting and Manual Tuning Guide
Issue 1
COMPANY CONFIDENTIAL
Page 3 – 67
Copyright © 2011 Nokia. All rights reserved.