Training and Vendor Development
CMO Operations & Logistics
Multimedia Creation & Support
CONFIDENTIAL
24.Sept.2007
27
Service Manual 5200 RM-74/RM-8 / 5300 RM-46/RM-47
Copyright © 2006-2007 NOKIA Corporation. All rights reserved.
Approved 4.0
MGR
Page
(46)
13. Before continue,- bring all sidekey levers into the position
shown.
14. Place the assemblies together, click the snaps into their
places.
15. Check the functionality of all keys before going on.
16. Mind the correct positioning of this metal clips.
17. Insert the screws.
18. Set the correct torque.