![Noblelift PTE15Q-A Instruction Manual Download Page 12](http://html1.mh-extra.com/html/noblelift/pte15q-a/pte15q-a_instruction-manual_1698054012.webp)
11
Hoisting
USE DEDICATED CRANE AND HOISTING EQUIPMENT
DO NOT STAND UNDER THE SWAYING LOAD
DO NOT WALK INTO THE HAZARDOUS AREA DURING HOISTING
Transportation
ALWAYS FASTEN THE TRUCK SECURELY DURING TRANSPORTATION ON A
TRANSPORT VEHICLE
Lower the forks and park the truck securely.
Fasten the truck according to Fig. 6 by fixing dedicated lashing belts to each side of the trucks crane
hook holes and fasten the other side at the transporting truck.
c.
Decommissioning
For storage, remove the load, lower the truck to the lowest position, grease all in this handbook
mentioned greasing points (regular inspection), and eventually protect the truck against corrosion and
dust. Remove the batteries and jack the truck safely, so that there will be no flattening after storage.
For final decommissioning hand the truck to a designated recycling company. Oil, batteries and electric
components must be recycled due to legal regulations.
5. DAILY INSPECTION
This chapter describes pre-shift checks before putting the truck into operation.
Daily inspection is effective to find the malfunction or fault on this truck. Check the truck on the following
points before operation.
Remove load from truck and lower the forks.
Fig. 5: Hoisting with a crane
Fig. 6: Fixing points