background image

 4180 

 517 

 557 

 20.35 

 164.57 

 21.93 

Use measurements to 

ensure correct alignment

CB1

JF1

S1

S3

Make sure corners 

are correctly 

aligned.

CB1

CB1

Step 1

 

Assemble

 S1

 and 

S3

 frames to make up the main structure using

CB1

 brackets for the corners and 

JF1

 brackets for the straight joints.

4

MEASUREMENTS IN BLUE - MM

MEASUREMENTS IN GREEN - INCHES

 

Summary of Contents for NSSR1601

Page 1: ...Assembly Instructions Shelter Type SR1603 SR1603 02 260916 USA Email Sales nobutts com Web www nobutts com Tel 1 888 662 8887 ...

Page 2: ... 11 4 3 13 10 7 8 12 2 EXPLODED VIEW Fittings Bolt set M10 Nut Washer Black Cap T25 T38 AB1210 M10 x 60mm 25mm Tech screw 38mm Tech screw M10 X 100mmC3 Concrete Bolt Pack A B 40 40 80 80 136 66 13 Required 38 38 76 76 60 30 7 Image ...

Page 3: ...ET 110 x 46 4 33 x 1 81 10 8 L3 BRACKET 73 x 38 x 3 2 87 x 1 50 2 9 R3 CURVED RAFTER 1035 x 40 x 40 40 75 x 1 57 x 1 57 5 10 L1 BRACKET 95 x 45 x3 3 74 x 1 77 8 11 B4 BEAM 2080 x 40 x 40 81 89 x 1 57 x 1 57 2 12 P4 POST 1995 x 40 x 40 78 54 x 1 57 x 1 57 1 13 JF3 BRACKET 220 x 30 8 66 x 1 81 1 14 SS SEALING STRIP Trim To Suit Trim To Suit 2 ROLLS 15 PCE1 ROOF PANEL 1150 x 1050 44 49 x 41 34 2 16 P...

Page 4: ...t alignment CB1 JF1 S1 S3 Make sure corners are correctly aligned CB1 CB1 Step 1 Assemble S1 and S3 frames to make up the main structure using CB1 brackets for the corners and JF1 brackets for the straight joints 4 MEASUREMENTS IN BLUE MM MEASUREMENTS IN GREEN INCHES ...

Page 5: ...A RB1 R3 L3 R3 RB1 L3 DETAIL A SCALE 1 4 L3 R3 Step 2 Attach the R3 end rafters using L3 brackets at the front and RB1 brackets for the rear 5 ...

Page 6: ...B T section DETAIL B SCALE 1 3 RB1 JF3 B4 P3 JF3 B4 P4 RB1 Step 3 Assemble the T section by attaching the B4 ties to the P3 post using RB2 and JF3 brackets 6 ...

Page 7: ...C L1 DETAIL C SCALE 1 6 L1 Step 4 Attach T section using L1 brackets ...

Page 8: ...FT3 FT1 FT3 FT1 Step 5 Move the shelter to its final position and make sure it is square and level Then attach the FT1 and FT3 foot brackets and use anchor bolts to secure the structure to the ground 8 ...

Page 9: ...CE1 PCC1 PCC1 SS PCE1 PCE1 PCC1 PCC1 Step 6 Apply Sealing strips SS to the rafters and line up the PCE1 roof panels with the outside of the shelter and equally space the PCC1 panels between the outer panels 9 ...

Page 10: ...using the 38mm Tech screws to secure the roof panels in place Then push the 2MD edge trim on to the bottom edge of the roof panels Fit Black plastic caps on exposed nuts and bolts and fit the square plastic end caps to any open ends of box section 10 ...

Page 11: ... 1035 1035 1044 50 2070 50 2069 50 4180 1139 18 78 44 85 167 36 41 12 40 75 40 75 40 75 81 48 81 52 164 57 20 73 11 PLAN VIEW OVERALL DIMENSIONS AND GROUND FIXING POSITIONS Suggested size for concrete base 200mm 7 87in oversized on all four sides ...

Page 12: ...06443 MAINTENANCE To ensure your product gives you many years of use we recommend that you THANK YOU FOR PURCHASING THIS PRODUCT Clean panels regularly with soapy water Ensure all fittings are tight for example after a big storm Touch up any exposed metal should it get scratched All Parts and Fixings checked by Print Name Signature ...

Reviews: