16
17
Wiring diagram of parallel system for Garun 30KL, 40KL
Wiring diagram of parallel system for Garun 60KL, 80KL
2.5. Software installation
For optimal computer system protection, install UPS monitoring software
from
https://www.power-software-download.com/viewpower.html
.
3.1. Initial operation
Step 1.
Before operation, make sure that the two strings of batteries are
connected correctly in order of ”+,GND,-” terminals and the breaker of the
battery pack is at “ON” position (only for long-run model).
Step 2.
Press the
POWER
button to set up the power supply for the
UPS. UPS will enter to power on mode. After initialization, UPS will enter to
“No Output mode”.
3.2. Screen description
After initialization, the LCD will display main screen.
There are five sub-menus: Control, measure, setting, information and data log.
Touch any sub-menu icon to enter into the sub-screen.
Operations
3
Main
Control
Measure
Setting
Info
Data Log
ON/OFF UPS
ON/OFF charger
Battery test
Mute all
Measure 1
Measure 2
Measure 3
Save setting
General
Advance
Basic 1
Basic 2
Electrical
Battery
Miscellaneous
Electrical
Battery
Miscellaneous
UPS self-test
SYS parameter
Install info
VOL CALLI
CURR CALLI
Initial
Data log
Parameters
Calibration
EEPROM
Touch
User
Maintainer
Basic info
Rated info
Parameter info
User mode
Password: 0000
Maintaner mode
Password: ****
Summary of Contents for Garun Series
Page 32: ...Memo Memo...
Page 33: ......