6
7
1.
Share current port (only
available for parallel model)
2.
Parallel port (only available for
parallel model)
3.
External battery connector
4.
Intelligent slot
5.
RS-232 communication port
6.
USB communication port
7.
Emergency power off function
connector (EPO connector)
8.
Input circuit breaker
9.
Output terminals
10.
Ground
11.
Input terminals
12.
Cooling Fan
13.
External maintenance bypass
switch port
14.
Battery pack output circuit
breaker
15.
External battery connector
2
3
6
10
13
11
12
7
9
4
8
1
5
15
14
14
15
2U battery pack
3U battery pack
Back View (Balder 6000/10000)
Battery packs
Important safety warnings
3
Please comply with all warnings and operating instructions in this manual
strictly. Save this manual properly and carefully read the following
instructions before installing the unit. Do not operate this unit before reading
through all safety information and operating instructions carefully:
Transportation
• Please transport the UPS system only in the original package to protect
against shock and impact.
Preparation
• Condensation may occur if the UPS system is moved directly from cold to
warm environment. The UPS system must be absolutely dry before being
installed. Please allow at least two hours for the UPS system to acclimate
to the environment.
• Do not install the UPS system near water or in moist environments.
• Do not install the UPS system where it would be exposed to direct
sunlight or near heat sources.
• Do not block ventilation holes in the UPS housing.
Installation
• Do not connect appliances or devices which would overload the UPS
system (e.g. laser printers) to the UPS output sockets.
• Place cables in such a way that no one can step on or trip over them.
• Do not connect domestic appliances such as hair dryers to UPS output
sockets.
• The UPS can be operated by any individuals with no previous experience.
• Connect the UPS system only to an earthed shockproof outlet which
must be easily accessible and close to the UPS system.
• Please use only VDE-tested, CE-marked mains cable (e.g. the mains cable
of your computer) to connect the UPS system to the building wiring
outlet (shockproof outlet).
• Please use only VDE-tested, CE-marked power cables to connect the
loads to the UPS system.
• When installing the equipment, it should ensure that the sum of the leakage
current of the UPS and the connected devices does not exceed 3.5mA.
Summary of Contents for Balder 10000
Page 43: ......