English
9
Operating Procedure
………………………………………………...
1. Fill the cold water tank
(Number 2 Diagram A)
with
clean cold
water only.
!!
Anything other than clean cold water used in the
water tank will void the manufacturers warranty.
2. Fill the detergent bottle
(Diagram B)
with Nilfisk ALTO approved detergent.
!! Unapproved detergent may be harmful or dangerous to the machine or the operator
using the machine. This may cause irrepairable damage to seals and will void the
manufacturers warranty.
3. Connect the Steam Hose to the front of the machine
(Number 7 Diagram A)
ensuring it is
pushed in all the way and the pin on the flap locks into the hole on the hose.
!!
Grease “O” rings on steam pin before connecting.
!! To release the steam hose, lift the flap and pull.
4. Plug the power cable into a 240 Volt supply.
!! Inspect the electric cable before every use. If the cable becomes damaged at
anytime the complete cable must be replaced by a Nilfisk ALTO approved distributor.
!! Never touch the power cable or plug with wet hands
!! Always unplug the machine when
i. The machine is not in use
ii. Cleaning the machine
iii. Any maintenance work is being carried out
8. Switch
the
On/Off
switch
(Number 11 Diagram B)
to the ON position. The Heater On light LED
(Number 13 Diagram B)
will illuminate.
9. Allow approximately 10 minutes for the boiler to heat the water
10. When the Steam Ready LED
(Number 14 Diagram B)
illuminates the machine is ready to be
used.