
29
Important regarding Danfoss actuator type AME 140
Reinstallation of the actuator must be done as follows:
1. Turn off the power supply and remove the actuator cover
2. Release the gear by pressing and holding the button at the bottom of the casing, while turning the spindle fully (anticlockwise)
3. Install the actuator and turn on the power supply
4. DIP-switch no. Move 1 to ON and then to OFF
5. Calibration runs automatically for up to 6 minutes (the diode is flashing during calibration. After completion, the light stays on)
6. Put the cover on the actuator
Nilan delivery:
1. Actuator and control valve
Not delivered by Nilan
2. Circulation pump
3. Sediment trap
4. Shut off valve
5. Bypass valve
Supply flow
Return flow