Operation and maintenance
When setting up the system, future service and maintenance should be taken into ac-
count.
Minimum clearance in front of the system of at least 1m is recommended.
Starting the heat pump
Before starting the heat pump, check the following:
•
Pressure in the central heating system, see Figure 13, point 17
•
Pressure in the ground heat exchanger system, see Figure 13, point 17
•
Check that both the central heating loop and the ground source loop have been ventilated.
•
The central heating circuit has an excess flow valve or other circulation, which ensures the
flow, see Figure 13, point 28
Check list for brine/water pump system at start-up and commissioning must be reviewed before
starting.
The heat pump can then be switched on at the safety switch.
The heat pump is shut off at the safety switch.
Figure 12: GEO installed with Compact P
1 central heating inflow - (3/4”)
2 central heating return - (3/4”)
3 brine inflow from ground pipe - (1”)
4 brine return from ground pipe - (1”)
5 safety valve - brine loop
6 manometer - brine loop
Delivered loosely with GEO - safety valve and manometer for central heating loop