4.1.3.2 Possibility of parallel operation
4.2 MECHANICAL START-UP INSPECTION 16
4.2.0.1 Alignment ; fixing ; prime mover
4.2.1 Anti friction bearing machines start up
4.3.2.0 Rotor speed rate of rise (Standard unit) 17
4.3.2.1 Rotating checks not excited
4.3.2.2 Rotating checks at no load excited
4.3.2.3 Generator and site safety parameters
4.3.2.4 Rotating checks at full load
4.3.3 Generator start up check list
5.3.2 Cleaning bearings from old grease
5.3.3 Cleaning bearings assembly area
5.5.2.4 Oil filtering and pollution
5.8.1 Steel screw in steel tapping
5.10 WINDINGS INSULATION CHECK
5.11 ROTATING DIODE BRIDGE TEST
5.13.1.2 Drying generator in a stopped position 32
5.13.1.3 Drying generator in rotation
10. TYPICAL ASSEMBLIES AND DRAWINGS
10.2 ANTI FRICTION BEARING ASSEMBLY 35
Electric Power Generation
Installation and maintenance
5654
en - 2017.
10
/
a
LSA 5
2
.2
MHV
Industrial Range Alternators
- 4 pole
3