3.4 ELECTRICAL CONNECTIONS 

3.4.0. General points 

The installation must comply with the electrical schematics 
attached in Section 5 
Check that all the protection devices are correctly 
connected and in good working order. 
The assembler has the responsibility to mechanically and 
electrically protect the generator within the best practice 
rules and to secure any operation over the defined tender 
(respect of capability curve ; overspeed …) 
For low-voltage machines, power supply cables must be 
connected directly to the machine terminals (without adding 
washers) 
For high-voltage machines, power supply cables should be 
connected to separate terminals or to current transformer 
terminals (without adding washers). 

NOTE:  
The gland plate is made of non magnetic material. 

CAUTION  

DO NOT ADD WASHERS TO THE POWER SUPPLY 
CABLE TERMINALS OTHER THAN THOSE USED BY 
THE MANUFACTURER OF THE ELECTRIC MACHINE 

Check that the lugs are tightened.(refer to chapter 5.8) 

 CAUTION 

ALL CURRENT TRANSFORMERS MUST BE 
CONNECTED OR SHUNTED 

 CAUTION 

A VOLTAGE TRANSFORMER MUST NEVER BE 
SHUNTED 

 CAUTION 

THE INSTALLED POWER CABLES MUST BE FIXED 
AND SUPPORTED IN SUCH A WAY AS TO BE ABLE 
TO WITHSTAND THE VIBRATION LEVEL REACHED BY 
THE GENERATOR IN OPERATION (refer to chapter 
2.1.3.4) 

The power cables must not stress (push, pull, bend ...) the 
generator terminals 

3.4.1 Phase-sequence 

3.4.1.1 Standard units ; IEC 34-8 

Except by special request of the customer, the phase-
sequence is carried out using the IEC 34-8 standard.  
An arrow located on the stator indicates the direction of 
rotation. 
Inside the terminal box a specific marking plate indicates 
the specific generator phase sequence. 

Clockwise rotation viewed 
from the shaft drive end 

Counter clockwise rotation 
viewed from the shaft 
drive end 

The phases are marked: 
U1, V1, W1. 

The phases are marked: 
U1, V1, W1. 

Viewed when facing the 
terminal box door the 
terminals are : 
 U1, V1, W1 

Viewed when facing the 
terminal box door the 
terminals are : 
 U1, V1, W1 

The installer connects : 
L1   -->  U1  
L2   -->  V1  
L3   -->  W1 

The installer connects : 
L3   -->  U1 
L2   -->  V1  
L1   -->  W1 

U2

 

V2

 

W2

 

U1

 

V1

 

W1

 

L1

 

L2

 

L3

 

U2

 

U1

 

V1

 

W1

 

L3

 

L2

 

L1

 

V2

 

W2

 

Electric Power Generation

 Installation and maintenance 

5654

 en - 2017.

10

 / 

a

 

LSA 5

2

.2 

MHV

 

Industrial Range Alternators 

- 4 pole

14

Summary of Contents for LEROY-SOMER LSA 52.2 MHV

Page 1: ...LSA 52 2 MHV 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Industrial Range Alternators 4 pole Installation and maintenance...

Page 2: ...3 1 TRANSPORT AND STORAGE 10 3 1 1 Transport 10 3 1 2 Storage warehouse 10 3 1 3 Maritime packing 10 3 1 4 Unpacking and installation 10 3 1 5 Storage measures of antifriction bearings10 3 1 6 Not ap...

Page 3: ...arings from old grease 24 5 3 3 Cleaning bearings assembly area 25 5 3 4 Bearing removal 25 5 3 5 Bearing re assembly 26 5 4 Not applicable 26 5 5 LUBRICANTS 26 5 5 1 Greases 26 5 5 2 Oils 27 5 5 2 1...

Page 4: ...ics use of lifting devices Local procedures must be scrupulously respected Any product sealing compound cleaning product used during any maintenance or servicing must be in accordance with local regul...

Page 5: ...3 The Rotating diodes bridge rotating part item 3 rectifies the three phases current in DC current which supplies the Revolving field rotating part item 4 The revolving field rotating part item 4 exci...

Page 6: ...175 C 170 C 180 C 175 C To improve the machine protection we recommend to set the alarm point following effective site conditions Alarm temperature Highest recorded temp 10 K Trip temperature Alarm te...

Page 7: ...ed copper wires class F insulation or H depending on the customer s request or size of the machine 2 2 3 Fan machines IC 0 A1 The synchronous machine is characterized by a self ventilation system A ce...

Page 8: ...chapter 3 4 3 2 3 1 Automatic voltage regulator AVR When the automatic voltage regulator is located in the terminal box it is fitted on a separate plate insulated from vibration by means of dampers Th...

Page 9: ...s based on the analysis of the vibration signal are able to monitor bearings behavior 2 6 Not applicable 2 7 Not applicable 2 8 Not applicable 2 9 Not applicable 2 10 Not applicable 2 11 Not applicabl...

Page 10: ...ER OF ITS LONG STORAGE GUARANTEE 3 1 4 Unpacking and installation DANGER THE DEDICATED LIFTING HOOKS MUST BE USED TO LIFT THE MACHINE WITH SLINGS ONE HOOK AT EACH CORNER OF THE MACHINE Rotors of machi...

Page 11: ...perature The machine must be aligned according to the Leroy Somer standard and adhere to the manufacturer s alignment standard for the drive machine When heating the machine has its shaft line which g...

Page 12: ...e to check the alignment with the coupling installed Equipment required Two rigid brackets The rigidity of the two brackets is very important Two micrometers Implementation During the measures both sh...

Page 13: ...mm In the plane C2 the axis B is further to the left than A 0 70 1 64 2 0 47 mm The representation of the shafts is as follows A B C1 C2 0 09 0 47 Regarding the horizontal plane the angular error is...

Page 14: ...AUTION A VOLTAGE TRANSFORMER MUST NEVER BE SHUNTED CAUTION THE INSTALLED POWER CABLES MUST BE FIXED AND SUPPORTED IN SUCH A WAY AS TO BE ABLE TO WITHSTAND THE VIBRATION LEVEL REACHED BY THE GENERATOR...

Page 15: ...erminal box must meet the electrical insulating distances This applies to power cables and lugs and to added transformers etc Nominal Voltage 500 V 1 KV 2 KV 3 KV Phase Phase in the air mm 25 30 40 60...

Page 16: ...ng values must not be overpass Max frequency shift 0 1 Hz Max phase offset 10 electrical angle Max voltage phase neutral between machines at phase offset 0 5 of the nominal voltage In case of wrong sy...

Page 17: ...nual mode Voltage adjustment check the excitation current value refer to Section 4 for the AVR manual and to Section 2 for the generator test report In AVR automatic mode Voltage adjustments Voltage r...

Page 18: ...e the vibrations Check that the vibration level is in accordance with the generator duty as per chapter 2 1 3 4 Electric Power Generation Installation and maintenance 5654 en 2017 10 a LSA 52 2 MHV In...

Page 19: ...power cables connections following phase order refer to chapter 3 4 1 ______________________ Terminal box connections ________________________________________ AVR detection voltage ___________________...

Page 20: ...eparate excitation mode _________________________ Negative sequence relay _____________________________________________________________ Over speed _____________________________________________________...

Page 21: ...spare part make sure that it is in good condition For any electrical work use electrical schematics for assistance The whole machine must be kept clean CAUTION ALL THE CLEANING PERIODS INDICATED IN T...

Page 22: ...thout gen stop Refer to 2 1 3 2 Insulation 8000 1 Refer to 5 10 4hrs Polarisation index 8000 1 Refer to 5 10 4 Bolts tightening 8000 1 Refer to 5 8 2 hrs Winding visual inspection 8000 1 Refer to 5 10...

Page 23: ...24 Daily operation without gen stop Refer to 2 5 1 5 1 6 Not applicable 5 1 7 Rubber dampers Rubber dampers 8000 Refer 2 3 1 5 1 8 Not applicable 5 1 9 Not applicable 5 1 10 Protection devices Protect...

Page 24: ...Few international studies report that more than 80 of the anti friction bearing installed worldwide for any duty are prematurely damaged because of lubrication trouble To preserve your machine we reco...

Page 25: ...Periodically clean the labyrinth seals outside face Remove the excess of grease which may appears onto the shaft Remove the excess of dry old grease from the bearing exhaust channel use a clean blade...

Page 26: ...IL POLYREX EM polyurea base Recommendation for a substitution grease choice Mineral oil or PAO SHC Base soap grade NLGI 2 Lithium complex base Lithium base accepted Base oil viscosity at 40 C 100 to 2...

Page 27: ...hort time If synthetic oil has to be used during the first 2000 hours of use the lubricant should be checked at short intervals Synthetic oils group concerns Synthetic hydrocarbons SHC Poly Alpha Olef...

Page 28: ...following ISO 4406 18 16 13 following NAS 1638 class 9 Filtering level to ensure oil circulation bearing following ISO 16889 100 25 c filtering 25 5 6 Not applicable 5 7 Not applicable 5 8 BOLT TIGHT...

Page 29: ...The identification of the equipment polarity may differ from one ammeter to another 5 10 WINDINGS INSULATION CHECK 5 10 0 General The insulation resistance enables the status of the machine insulating...

Page 30: ...ng to be verified and gives an indication of the pollution of the winding A poor polarization index may be corrected by a cleaning and drying of the winding The following measurements can be taken at...

Page 31: ...ject to hydrolysis in damp atmospheres are prohibited They quickly become acidified producing corrosive and conductive hydrochloric acid CAUTION DO NOT USE TRICHLORETHYLENE PERCHLORETHYLENE OR TRICHLO...

Page 32: ...at its nominal speed Several thermometers must be positioned onto the winding and the temperature must not exceed 75 C 167 F If one of the thermometers exceeds this value immediately reduce the heati...

Page 33: ...ABSOLUTLY NECESSARY A RE VARNISHING OPERATION DONE ON A WINDING STILL DIRTY OR NOT PERFECTLY DRY MAY CONDUCE TO A DEFINITIVE LOSS OF INSULATION Electric Power Generation Installation and maintenance 5...

Page 34: ...Stator winding 8 Stator ribs 9 Stator lamination 10 Polar wheel 11 Balancing disc 12 Exciter field 13 Exciter armature 14 Non drive end shield 15 Bearing non drive end 16 Rotating resistances 17 Rota...

Page 35: ...4 Roller bearinG Bearing assembly Marine Drive end Non drive end 1 End cover 1 End shield 2 End cover fixing screw 2 End cover 3 Ball bearing 3 End cover fixing screw 4 End shield 4 Bearing pre load s...

Page 36: ...Electric Power Generation Installation and maintenance 5654 en 2017 10 a LSA 52 2 MHV Industrial Range Alternators 4 pole 36...

Page 37: ...Electric Power Generation Installation and maintenance 5654 en 2017 10 a LSA 52 2 MHV Industrial Range Alternators 4 pole 37...

Page 38: ...ctured by Leroy Somer or on Leroy Somer s behalf comply with the following International Standards and Directive EN and IEC 60034 1 60034 5 and 60034 22 ISO 8528 3 Reciprocating internal combustion en...

Page 39: ...nd efficient repair support and maintenance services Trust your alternator maintenance and support to electric power generation experts Our field personnel are 100 qualified and fully trained to opera...

Page 40: ...www leroy somer com epg 2017 10 a Linkedin com company Leroy Somer Twitter com Leroy_Somer_en Facebook com LeroySomer Nidec en YouTube com LeroySomerOfficiel 5654 en...

Reviews: