LIQUID LEVEL
8,14, 22 Litre Baths
Minimum - must cover the top of the false base by 70mm
Maximum - must not exceed the ridge in the tank.
28 + 56 Litre Baths
Minimum - must cover the top of the false base by 130mm.
Maximum - must not exceed the ridge in the tank.
38 Litre Bath
Mininum - must cover the top of the false base by 130mm.
Maximum - must cover the top of the false base by 190mm.
NE4-25D
Minimum - minimum level mark on tank.
When filling or emptying the bath disconnect the unit from the mains
electrical supply.
SUITABLE LIQUIDS
Operating temperatures and recommended liquid options:
- 20°C to Ambient
100% Heat transfer liquid.
The LB range is formulated for tempera
tures from -45°C to 90°C and provides complete protection from
freezing and algae growth and safeguards against corrosion. See
accessories for the full range available.
100% car antifreeze (ethylene glycol)
.
Ambient to 99°C
Distilled water.
Virkon dissolved in distilled water.
Proven efficacy against
bacteria, viruses, spores a nd fungi in a variety of independant tests
using different protocols.
Heat transfer liquid.
The LB range is formulated for temperatures
from -45°C to 90°C and provides complete protection from freezing
and algae growth and safe guards against corrosion. See accessories
for the full range available.
99°C to 130°C
For use above 99°C we recommend [NE4-HT series]:
Silicone oils
[up to 10 centistokes].
Synthetic thermal liquids
.
Above 60°C or below room temperature it is recommended that
to achieve optimum performance the bath should be covered
with SL4 lid or polypropylene spheres.
NE4-P AND NE4-HT SERIES CONNECTING CIRCULATED SUPPLY
This range of water baths are deisgned for external circulation of tem-
perature controlled water in a closed circuit.
1. Turn unit off.
2. Inlet and Outlet ‘push and lock’ connectors are located on the rear of
the bridge unit behind the thermocirculator. These are fitted with a
factory fitted link which needs to be removed to fit the
desired pipes/hoses.
2. Depress the collar on the ‘push and lock’ connectors to release the factory fitted link.
3. Push the desired pipes/hoses into the ‘push and lock’ connectors. Please note 6mm diameter hose
is suitable. The pipe/hose will automatically be locked in place for secure external
circulation.
4. To check the pipe/hoses for leakage prior to normal operation we suggest the
following:
- Fill the tank with water/oil.
- Switch unit on.
- Any leaks will now become apparent and the pipe/hose should be replaced.
- Switch off and refit replacement hose. Please see page 11 for accessories hoses.
The Clifton Range - 3 Year Warranty
8