Quick start instructions
(For those who don't have time!)
Sliding Gate Operators
GDS 450, 630 “LI” Range
Made in Australia from Australian & quality imported components
Place operator in correct position (Pinion wheel to be parallel to
the gate and stepped out to allow for width of rack once it is
mounted onto the gate frame). Mark out fixings and fix operator
to the concrete pad.
Fix rack to the gate frame keeping 1mm-2mm clearance between
the rack teeth and Pinion wheel.
Once the rack is fixed move the gate and sight the rack
moving over the pinion wheel, check that most of the pinion
wheel meshes with the rack. Make sure rack runs freely over
the pinion wheel, any tights spots should be corrected by
adjusting the rack height. Check the operator is firmly bolted
down to the concrete pad.
Ensure stops are installed on the gate for the fully closed and fully
open positions.
Connect required P.E Beams. Adjust Limits to actuate prior to
gate end positions. Connect power supply. Turn on Power.
Observe that the M1 op and cl limit indicator led`s turn when
the corresponding limit switch is activated. If they are the
wrong way around, swap the op and cl limit wires around.