
Inspection of the installation
Current regulations require the heating installation to be inspected before it is commissioned. The inspection must
be carried out by a suitably qualified person.
Date
Signature
Notes
Description
✔
Heat pump (page 14)
Shut off valves
Venting valve
Shut off valve
Hot water (page 14)
Shut off valves
Mixing valve
Expansion vessel
T&P valve
Tundish
Cold water (page 14)
Shut off valves
Non-return valve
Safety valve
Tundish
Electricity (page 16)
Connected supply
Sensors
Temperature limiter
Miscellaneous
Benchmark checklist
VPA 300/200
Chapter 1 |
Important information
6