Nibe VPA 200 User'S And Installer'S Manual Download Page 5

Warranty and insurance information

Thank you for installing a new NIBE water heater in your
home.

NIBE water heaters are manufactured in Sweden to the
very highest standard so we are pleased to offer our
customers a comprehensive guarantee.

The product is guaranteed for 24 months for parts and
labour from the date of installation or 33 months from
the date of manufacture, whichever is the shorter.

The NIBE guarantee is based on the unit being installed
and commissioned by a NIBE accredited installer, serviced
every year and the Benchmark documents completed.
Where this condition is not met, any chargeable spare
parts or components issued within the applicable guar-
antee period still benefit from a 12 month warranty from
the date of issue by the manufacturer.

We recommend the installer completes and returns as
soon as possible, your guarantee registration card or
completes the guarantee form on the NIBE website
www.nibe.co.uk.

Please ensure that the installer has fully completed the
Benchmark Checklist in the end of the Installation Instruc-
tions supplied with the product and that you have signed
to say that you have received a full and clear explanation
of its operation. The installer is legally required to com-
plete a commissioning checklist as a means of complying
with the appropriate Building Regulations (England and
Wales).

All installations must be notified to Local Area Building
Control either directly or through a Competent Persons
Scheme. A Building Regulations Compliance Certificate
will then be issued to the customer who should, on re-
ceipt, write the Notification Number on the Benchmark
Checklist.

This product should be serviced regularly to optimise its
safety, efficiency and performance. The service engineer
should complete the relevant Service Record on the
Benchmark Checklist after each service.

The Benchmark Checklist may be required in the event
of any warranty work and as supporting documentation
relating to home improvements in the optional docu-
ments section of the Home Information Pack.

5

Chapter 1 |

Important information

VPA 300/200

Summary of Contents for VPA 200

Page 1: ...User and Installer manual UN VPA 300 200 UK Indirect heated storage water heater CHB GB 1711 2 331894...

Page 2: ......

Page 3: ...Table of Contents 4 1 Important information 7 2 For the User 8 3 For the Installer 17 4 Technical data 20 Item register 3 Table of Contents VPA 300 200...

Page 4: ...not dispose of used products with normal household waste It must be disposed of at a special waste station or dealer who provides this type of service Improper disposal of the product by the user resu...

Page 5: ...ase ensure that the installer has fully completed the Benchmark Checklist in the end of the Installation Instruc tions supplied with the product and that you have signed to say that you have received...

Page 6: ...te Signature Notes Description Heat pump page 14 Shut off valves Venting valve Shut off valve Hot water page 14 Shut off valves Mixing valve Expansion vessel T P valve Tundish Cold water page 14 Shut...

Page 7: ...an be opened and a pipe coupling on the hot water side can be loosened The climate system 1 Cut the current to the immersion heater and solenoid valve 2 Shut off the incoming cold water Empty the doub...

Page 8: ...1 C R 0 R 0 2 0 2 1 R 0 H M flo w 4 9 5 0 C H o t w a te r 5 1 C 2 0 2 1 R 0 H M flo w 4 9 5 0 C H o t w a te r 5 1 C R 0 Assembly The water heater is only designed for upright installation The water...

Page 9: ...gnation T P valve FL5 Venting heating medium QM20 Submerged tube hot water heating 10 mm int sensor BT6 UA1 Submerged tube connection temperature limiter 11 mm int UA2 Adjustable feet UL1 Lifting eye...

Page 10: ...s approx 200 mm less without the insulated jackets Insulation removed Do not use any tools when dis mantling the joining plate The figure shows VPA 300 200 Cu with insulation UN UN Carry out assembly...

Page 11: ...losed cover discs before pipe installation The cover discs with self adhesive backs must be installed on the relevant connection by pushing them over the connections All connections including connecti...

Page 12: ...ve QN17 Cold water inlet and pressure relief valve water heater RM1 Pocket tube UA2 There s a plug on the cold water inlet valve that can be removed and there mount the flexble hose for the ex panssio...

Page 13: ...Temperaure sensor return BT3 Drain valve QM1 Hot water sensor BT6 Shut off valve QM30 Temperaure sensor condenser out BT12 Shut off valve QM40 Indoor sensor BT50 Shut off valve QM41 Return line sensor...

Page 14: ...Tundish Metal discharge pipe from temperature relief valve to tundish Safety device e g temperature relief valve 300 mm minimum Metal discharge pipe from tundish with continous fall Possible wall Disc...

Page 15: ...the incoming cold water pipe and the heating sys tem Open the filling valve The primary part of the VPA 300 200 can now be filled with water 2 After a while the pressure gauge if installed will show r...

Page 16: ...d with one hot water sensor for display and control The sensor is positioned in the pocket tube for the sensor UA1 Use the sensors provided with the heat pump control module Whennoheatsensorshavebeenp...

Page 17: ...Dimensions VPA 300 200 20 55 204 1757 951 1351 879 852 256 306 170 100 100 17 Chapter 4 Technical data VPA 300 200 4 Technical data...

Page 18: ...m Connection cold water XL3 28 mm Connection hot water XL4 G1 Connection docking in XL8 G1 Connection docking out XL9 15 mm Connection T P valve XL29 G2 Connection for immersion heater XL35 can be use...

Page 19: ...above 40 C 10 4 kW Heat transfer 60 50 C at 60 C hot water temperature 13 2 kWh Heat content at 50 C 90 C Max temperature heating fluid 90 C Max operating temperature T P valve 25 kW Maximum power su...

Page 20: ...Marking 4 P Pipe connections Cleaning the climate system 15 Hard water areas 15 S Safety information 4 Inspection of the installation 6 Marking 4 Symbols on VPA 300 200 4 Warranty information 5 Symbol...

Page 21: ...e and pressure relief valve and expansion valve been fitted and discharge tested Yes No The tundish and discharge pipework have been connected and terminated to Part G of the Building Regulations Yes...

Page 22: ...mments Signature SERVICE 3 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 4 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 5 Date Engineer Nam...

Page 23: ......

Page 24: ...on a343 WS release date 2017 04 04 08 10 Publish date 2017 04 04 08 29 NIBE Energy Systems Ltd 3C Broom Business Park Bridge Way Chesterfield S41 9QG Phone 0845 095 1200 Fax 0845 095 1201 info nibe co...

Reviews: