background image

10

Buffer tanks 

UKV 20-220/300/500/750/1000

5. SERVICE

Report any malfunctions in the buffer tank operation to the 

authorized service centres. 

The  tank  may  only  be  repaired  /  serviced  by  an  au-

thorized service since improper repair can cause safety 

risks, and the loss of product warranty.

CAUTION

Parameter

U/m

Tank model

UKV 20-220

UKV 20-300

UKV 20-500

UKV 20-750

UKV 20-1000

Energy efficiency class 

-

C

C

C

C

C

Storage volume (V)* 

l

218,3

296,0

495,6

740,7

991,0

Standing loss (S)* 

W

77,1

94,6

97,5

122,5

140,4

Max tank operating temp.

°C

85

Max tank operating pressure

bar

6

Electric heating module 

connection

inch

2” female

2 x 2” 

female

2 x 2” 

female

2” female

2” female

Weight

kg

61

83

111

170

200

7. TECHNICAL DATA

6. RECYCLING AND DISPOSAL

According to the NIBE rules, the products have been manufac-

tured of high quality materials using the latest technologies 

and solutions that do not endanger the environment.

When selecting materials, we took into account both the pos-

sibility of reuse of materials (recycling) that can be disassem-

bled  and  separated  from  materials  unsuitable  for  recycling, 

as well as risks arising from the processing of materials not 

intended to reuse.

The purchased device consists in more than 90 % of parts that 

can be recycled and reused, so they are safe for the environ-

ment and human health.

In  order  to  prevent  damage  to  piping  systems  and 

environmental  pollution,  the  product  should  only  be 

disassembled and taken out of service by appropriately 

qualified specialists.

CAUTION

At end-of-life, take care that the product and all the 

equipment were disposed of in accordance with appli-

cable regulations.

CAUTION

The packaging, in which the product is delivered, is made 

mainly of materials suitable for recycling and utilization. 

After installation, you should ensure the proper disposal 

of packaging in accordance with applicable regulations.

Information

Warnings:

•  Never activate circulation of the heating medium unless 

the buffer tank is filled with the heating medium.

•  Never operate the buffer tank if you find any malfunction 

in the safety valve operation.

•  Never  install  any  device  (such  as  cut-off  and/or  check 

valves,  etc.)  between  the  tank  and  the  safety  valve  or 

open expansion tank (except T-pipes.)

•  Any repairs of the buffer tank by the user are forbidden.

•  Stopping water leaks from the safety valve is not allowed.

Table 1. 

Technical data

•  Limit the setpoints of the heating medium temperature 

controllers in the buffer tank supply lines to 85 °C.

•  Check  the  operation  of  the  safety  valve  periodically  as 

described by the manufacturer of the valve in order to 

check whether it is not clogged 

•  In order to eliminate any odour of hydrogen sulphide (caused 

by bacteria in the oxygen deficient water), we recommend 

observing the periodic cleaning of the tank and replacement 

of the anode and, in addition periodically increase the hot wa-

ter temperature in tank to prevent bacterial growth.

•  Report any malfunctions in the buffer tank operation to 

the authorized service centres. You can find the complete 

list of our authorized service centres

•  Open the vent to vent the buffer tank before the heating 

season start.

•  Check filling of the C/H system from time to time.

Practical Recommendations:

4.5 Warnings and Practical Recommendations

* Acc. to EU regulations No. 812/2013 & 814/2013.

INSTALLATION AND OPERATING MANUAL

To  prevent  bacterial  growth  we  recommend  to  make 

sure a periodically increase of hot water temperature for 

a shorter time at regular intervals e.g. every 14

th

 day.

CAUTION

Summary of Contents for UKV 20-1000

Page 1: ...Installation and Operating Manual Buffer tanks 20 220 20 300 20 500 20 750 20 1000 UKV UKV UKV UKV UKV 29 01 2016 25617 ...

Page 2: ...product is not intended for use by persons with reduced physical fitness mental efficiency or without sufficient experience and knowledge if they are not supervised or instructed by a person responsible for their safety Operation of the product by children is strictly prohibited We reserve the right to make the product design changes and changes in the manual NIBE 2016 ...

Page 3: ... of the Tank 7 3 2 Housing Disassembly 7 3 3 Installation Requirements 8 4 CONNECTION AND START UP 9 4 1 Connection 9 4 2 Start Up 9 4 3 Thermal Insulation of the System 9 4 4 Frost Protection 9 4 5 Warnings and Practical Recommendations 10 5 SERVICE 10 6 RECYCLING AND DISPOSAL 10 7 TECHNICAL DATA 10 7 1 Dimensions 11 8 WARRANTY TERMS CONDITIONS 14 ...

Page 4: ... the installation in spection and maintenance are intended for the quali fied installer CAUTION The manufacturer shall not be held liable for any da mages caused by failure to comply with the recommen dations and observations contained in this Manual CAUTION Buffer tanks are used for storage and transfer of energy conta ined in the heating medium The accumulated energy is trans ferred to the heati...

Page 5: ... return from the heating system 9 Connector pipe return to the heat source 10 Lower tank insulation 11 Adjustable foot 12 Thermometer 13 Connector pipe for mounting electric heating unit 14 Tank cover 4 4 2 2 9 9 6 6 All products are ready for the installation of a heating unit containing an electric heater with thermostat and thermal switch Information INSTALLATION AND OPERATING MANUAL 14 14 UKV ...

Page 6: ...ector pipe supplying from the heat source 5 Temperature sensor cover 6 Steel tank 7 Tank insulation 8 Connector pipe return from the heating system 4 10 11 10 2 9 6 Fig 9 Side view of the UKV 20 750 and UKV 20 1000 buffer tank 14 15 9 Connector pipe return to the heat source 10 Connector pipe 11 Water gate 12 Lower tank insulation 13 Adjustable foot 14 Thermometer 15 Connector pipe for mounting el...

Page 7: ...e the jacket surrounding the tank housing jacket 6 Remove the four piece thermal insulation 1 2 3 4 5 6 Buffer tanks of UKV Series should be installed in a dry area protected against temperatures below 0 C e g in the base ment boiler room etc Location and manner of installation must ensure trouble free maintenance and servicing of the unit in the future Select the device location in a way allowing...

Page 8: ... source with blow off pressure not exceeding the max operating pressure of the unit for the max operating pressures of the units see Table 1 Technical data Some amount of the heating medium can leak from the safety valve during normal operation therefore you should install a drain line in the safety valve allowing safe drain of the heating medium to the sewerage or drain grate Safety valve drain l...

Page 9: ...ank and the C H sys tem after filling them Vent the unit through the vent installed in the top head of the tank see Fig 14 After completion of the above steps the system is ready for operation You can use the facility heating system after star ting up the heat source and reaching the required temperatu re of the heating medium Switch OFF the heating units and wait until the he ating medium cools d...

Page 10: ...ging in which the product is delivered is made mainly of materials suitable for recycling and utilization After installation you should ensure the proper disposal of packaging in accordance with applicable regulations Information Warnings Never activate circulation of the heating medium unless the buffer tank is filled with the heating medium Never operate the buffer tank if you find any malfuncti...

Page 11: ...000 INSTALLATION AND OPERATING MANUAL 7 1 Dimensions F F E E D D L L N N M M J J K K H H I I G D D E E F F G H H I I J J K K L L O O W W Fig 15 Dimensions of the UKV 20 220 buffer tanks Fig 16 Dimensions of the UKV 20 300 20 500 buffer tanks ...

Page 12: ... tanks Table 3 Dimensions of the UKV 20 220 20 300 20 500 buffer tanks INSTALLATION AND OPERATING MANUAL Connection U m Buffer tanks UKV 20 220 UKV 20 300 UKV 20 500 D Return to heat source inch 1 female E Heating unit connection inch 2 female F Supply from heat source inch 1 female G Heating unit connection inch 2 female H Return from heating system inch 1 female I Temperature sensor cover mm ø16 ...

Page 13: ...ensor enclosure mm ø16 female O Thermometer enclosure mm ø10 female P Heating system supply inch 2 female N Vent inch female Dimensions UKV 20 750 UKV 20 1000 B mm 1020 1130 C mm 1000 1110 D mm 100 115 E mm 498 533 F mm 528 563 G mm 1028 1063 H mm 1548 1583 I mm 100 115 J mm 558 593 K mm 708 743 L mm 1023 1058 M mm 1213 1248 N mm 1393 1428 P mm 1773 1828 S mm 2010 2078 W mm 21 0 15 INSTALLATION AN...

Page 14: ...14 Buffer tanks UKV 20 220 300 500 750 1000 NOTES NOTES ...

Page 15: ......

Page 16: ...rielle RD 28 Rue du Pou du Ciel 01600 Reyrieux Tel 04 74 00 92 92 Fax 04 74 00 42 00 E mail info nibe fr www nibe fr FR NIBE Energy Systems Ltd 3C Broom Business Park BridgeWay Chesterfield S41 9QG Tel 0845 095 1200 Fax 0845 095 1201 E mail info nibe co uk www nibe co uk GB NIBE Energietechniek B V Postbus 634 NL 4900 AP Oosterhout Tel 0168 477722 Fax 0168 476998 E mail info nibenl nl www nibenl n...

Reviews: