
General pipe
connections
Pipe installation must be carried out in accordance with
current norms and directives.
Lowest permitted temperature of incoming brine is -8°C.
Pipes and other cold surfaces must be insulated with
diffusion-proof material to prevent condensation.
SYMBOL KEY
Meaning
Symbol
Shut-off valve
Non-return valve
Circulation pump
Expansion vessel
Filterball
Fan
Pressure gauge
P
Safety valve
Trim valve
Manual reversing valve/shunt
Bore hole
Ground collector
Heat pump
OUTLINE DIAGRAM
P
-QZ20
The brine system must be fitted with a pressure expan-
sion vessel and a particle filter or filterball. In order to
make any future servicing easier, one or more shut-off
valves should be fitted.
NOTE
Venting may be necessary during installation
and after a period of use. Venting takes place
through vent valve (QM21). When venting, set
the switch for the circulation pump (SF2) to
position "0".
COMPATIBLE NIBE HEAT PUMPS
FLM S45 ventilates the building and preheats the brine,
regardless of which ground source heat pump is in-
stalled, but when FLM S45 is installed together with a
compatible ground source heat pump, it is possible to
adjust settings and read off sensor values etc. in the
heat pump’s display.
Compatible products
• S1255
• S1155
11
Chapter 4 | Pipe and ventilation connections
NIBE FLM S45
4 Pipe and ventilation
connections
Summary of Contents for FLM S45
Page 1: ...IHB EN 1926 1 531269 INSTALLER MANUAL Exhaust air module NIBE FLM S45...
Page 2: ...LEK LEK LEK...
Page 37: ......
Page 38: ......