List of components

For the Installer

21

FIGHTER 200P

1 Immersion heater - 3,0 kW
3 Thermostat for immersion heater
5 Limiting valve, heating system
6 Temperature limiter
7 Temperature limiter, compressor
8 Power switch with mode 0 - 1 - 2 - 3
9 Feeding terminal and room thermostat

16 Circulation pump
17 Circulation pump vent screw
18 Pushbutton switch for circulation pump
19 Setting knob for limiting valve
20 Exhaust air ventilation device
22 Connection terminal for fan capacity
25 Pushbutton switch for hot water prioritising
26 Motor protection device for compressor
27 Compressor
28 Working capacitor for compressor
30 Indicator lamp "Compressor running/alarm"
31 Indicator lamp "Defrosting on/check filter"
32 Indicator lamp "Immersion heater on"
33 High pressure pressostat
34 Microprocessor card with power pack
35 Capacity setting for circulation pump

36 Exhaust air fan
41 Low pressure pressostat
42 Boiler pressure gauge
43 Boiler thermometer
44 Shutoff valve for circulation pump & heating

system outlet

47 Safety valve for water heater
48 Expansion valve
49 Combined filling & non return valve for heating

system

50 Shutoff valve for heating system inlet (return)
51 Drain valve for heating system
52 Safety valve for heating system
53 Vacuum valve (hidden)
54 Fan transformer 
57 Working capacitor for exhaust air fan
58 Tension load stop for feeding conductor
59 Tension load stop for room thermostat conductor
62 Evaporator
63 Air filter
65 Filter drier
66 Type plate
69 Compressor heater

Connection                       Setting-out dimensions

A

B

C

70 Flow line for heating system ............................................. Compression ring Ø 22 mm 100 ... 465 ...... 90
71 Return line for heating system  ......................................... Compression ring Ø 22 mm 130 ... 465 ...... 190
73 Cold water inlet  ................................................................ Compression ring Ø 22 mm 180 . 465 ...... 290
74 Hot water outlet from water heater  ................................... Compression ring Ø 22 mm 295 ... 465 ...... 345
77 Side access panel to valve connections
78 Filter box (hidden)
79 Drain & overflow connection from water heater
80 Drain connection from heating system  ............................. R 15 utv

82 Room thermostat (accessory)

84 Ventilation opening
85 Expansion vessel
86 Temperature sensor from evaporator
88 Temperature sensor from immersion heater & hot water prioritising
90 Ventilation connection for exhaust air  .............................. Ø 125 mm ..................... 2095 ...... 295 ...... 160
91 Ventilation connection for vented air  ................................ Ø 125 mm ..................... 2095 ...... 295 ...... 485
94 Temperature sensor for working compressor
95 Overflow pipe from water heater safety valve
96 Overflow pipe from heating system safety valve
97 Condensate drain from fan box
98 Overflow water discharge ................................................. PVC-pipe, 32 mm outer diameter
99 Collecting funnel for overflow water

103 Serial No. plate
104 Temperature and pressure valve
105 Pressure reduction valve
107 Expansion vessel, tap water
108 Tundish from safety valve
109 Tundish from pressure valve

Summary of Contents for Fighter 200P

Page 1: ...L E K 2 3 1 20 100 40 80 60 C 0 120 T G R INSTALLATION AND MAINTENANCE INSTRUCTIONS FIGHTER 200P Immersion heater 3 kW MOS GB 0511 1 511052 FIGHTER 200P...

Page 2: ...LEK Fighter 310P Fighter 310P LEK Fighter 310P Fighter 310P 1 2 LEK Fighter 310P Fighter 310P LEK Fighter 310P Fighter 310P 3 4 5...

Page 3: ...17 Freezing protection and hot water prioritising 17 Service Opening the cover on the distribution box 18 Refrigerant system 18 Electrical circuit diagram Electrical circuit diagram 19 Component loca...

Page 4: ...talled If corresponding with NIBE kindly state the serial number 103 of the FIGHTER 200P 089_ _ _ _ _ _ _ _ _ _ _ Maxiumum water supply pressure 16 bar Operating pressure tap water 6 bar Expansion ves...

Page 5: ...e refrigerant drops and its phases changes from gas to liquid The refrigerant then goes via a filter to the expansion valve where the pressure drops and the temperature is lowered fur ther The refrige...

Page 6: ...ater and circulation pump operational on demand 3 Standby mode Fan is operational Compressor is not operational Immersion heater and circulation pump operational on demand Pressure gauge Here the pres...

Page 7: ...ith water Check that the filter is not damaged New original filters can be ordered from NIBE Re assembly takes place in the reverse order The cleaning time intervals vary depending on the amount of du...

Page 8: ...ty valve 104 does not normally release water The safety valves must be checked regularly Check one valve at a time as follows Open the valve Check that water flows through the valve Close the valve Th...

Page 9: ...Thermostat 3 for immersion heater set too low Low temperature or a lack of hot water Circuit or main MCB tripped RCD if fitted tripped Temperature limiter 6 tripped Contact service Wrongly set room t...

Page 10: ...the button on top of it see figure The pressostats are within reach by ope ning the filter box High pressure pressostat Low pressure pressostat Normally this pressostat resets automati cally so it do...

Page 11: ...200 weighs roughly 435 kilos the floor must stand such a weight The heat pump should be transported and stored ver tically in the dry The heat pump contains highly inflam mable refrigerant Special car...

Page 12: ...Discharge pipes from tundishes shall have av vertical section of pipe at least 300 mm long before any elbows or bends in the pipework See following picture General If the vertical distance 300 mm is h...

Page 13: ...heat pump is connected so that any contaminants do not damage the components parts Hot and cold water are connected to pos 74 hot water and 73 cold water The attendant expansion vessel 107 must be con...

Page 14: ...This is especially important if there are exhaust air devices in bedrooms Because the heat pump contains a flammable refrigerant in the form of propane R290 the air ducting system must be earthed Thi...

Page 15: ...ally a room thermostat is used controlling the starts and stops of the circulation pump When the set room temperature is reached the circulation pump is stopped and starts again when the temperature d...

Page 16: ...e room thermostat Room thermostat RT 10 9 Install the room thermostat in a neutral position where the set temperature is required A suitable place is on a free inner wall in a hall approx 1 5 m above...

Page 17: ...52 and the rest of the heating system through the relevant venting valves Keep topping up and venting until all air has been removed and the pressure is correct Filling the heating system Venting the...

Page 18: ...over 80 from the valve 51 Screw on the hose coupling and open the valve 51 Open the safety val ve 52 to let air into the system Draining the heating system Readjustment Draining the water heater Set t...

Page 19: ...es slight ly negative Also note that while this heating the immersion heater is operational although the power switch is set to 1 Periodical temperature increase NOTE Periodical temperature increase i...

Page 20: ...t rests on stops on eit her side of the front panel Work on the refrigerant system must be done by authorised personnel in accor dance with the relevant legislation on refrigerants supplemented by add...

Page 21: ...0P T T 9 86 25 15 34 94 88 8 3 6 54 1 16 11 18 57 20 36 N L L1 N P P 27 26 28 41 33 T 82 82 13 Brown Blue Black C R S 2 1 5 3 4 6 L ge 0 L ge 1 L ge 2 L ge 3 AC DC 230 V 12 V Rel 3 Rel 1 Rel 2 69 22 T...

Page 22: ...30 Fram ledning radiatorer 9 3 6 11 18 59 16 17 44 70 5 19 78 27 36 33 58 108 52 96 109 97 42 62 48 63 87 65 99 ter ledning radiatorer k v v v 41 35 51 80 71 50 79 74 47 84 98 85 43 53 1 k v v v Blaha...

Page 23: ...n 54 Fan transformer 57 Working capacitor for exhaust air fan 58 Tension load stop for feeding conductor 59 Tension load stop for room thermostat conductor 62 Evaporator 63 Air filter 65 Filter drier...

Page 24: ...5 C 355 600 2095 440 115 295 70 35 40 20 35 70 A B and C see Connection in Component list Pipes must not be run from the floor in the area indicated by dots A clear space of 500 mm is needed in front...

Page 25: ...or the Installer FIGHTER 200P Accessories Expansion vessel tap water is delivered separately LEK 107 Room thermostat RT 10 Part no 418 366 L E K 1 0 15 20 2 5 3 0 C LEK Heightening console Height 125...

Page 26: ...t excl feet 15 40mm 2 095 mm Width 600 mm Net weight 195 kg Volume in double jacket 70 liter Expansion vessel volume tap water 18 liter Max operating current 16 7 A Circulation pump power rating 100 W...

Page 27: ......

Page 28: ...NIBE AB SWEDEN R Tel 46 0 433 73 000 Fax 46 0 433 73 190 E mail info nibe se www nibe com Box 14 J rnv gsgatan 40 SE 285 21 MARKARYD...

Reviews: