background image

Transport and storage

ERS 10 should be transported and stored in the dry.

Assembly

ERS 10 is installed on the enclosed rail on a solid wall.
Noise from the fans can be transferred to the rail.

Install with its back to an outside wall, ideally in a room
where noise does not matter, in order to eliminate
noise problems. If this is not possible, avoid placing it
against a wall behind a bedroom or other room where
noise may be a problem.

Wherever the unit is located, walls to sound sensitive
rooms should be fitted with sound insulation.

Because water comes from ERS 10, the condensation
drain with the necessary water seal must be led to the
internal drain.

Installation area

Leave free space of 800 mm in front of the product.

800

NOTE

Ensure that there is sufficient space (300 mm)
above the exhaust air module for installing
ventilation hoses.

Supplied components

LE

K

Rail for wall mounting

NIBE™ ERS 10-500

Chapter 2 |

Delivery and handling

6

2 Delivery and handling

Summary of Contents for ERS 10-500

Page 1: ...Installer manual LEK NIBE ERS 10 500 Ventilation heat exchanger IHB GB 1622 1 331802...

Page 2: ......

Page 3: ...11 General ventilation connections 11 Preheating the outdoor air 11 Ventilation flow 11 Adjusting ventilation 12 5 Electrical connection 12 Connecting to main product 14 6 Commissioning and adjusting...

Page 4: ...oduct meets all regulations that are placed on it based on relevant EU directives The CE mark is obligatory for most products sold in the EU regardless where they are made Serial number The serial num...

Page 5: ...u Pou du Ciel 01600 Reyrieux Tel 04 74 00 92 92 Fax 04 74 00 42 00 E mail info nibe fr www nibe fr FR NIBE Energy Systems Ltd 3C Broom Business Park Bridge Way Chesterfield S41 9QG Tel 0845 095 1200 F...

Page 6: ...a bedroom or other room where noise may be a problem Wherever the unit is located walls to sound sensitive rooms should be fitted with sound insulation Because water comes from ERS 10 the condensation...

Page 7: ...rself LEK Removing parts of the insulation Front insulation The insulation in the front must be removed to access the internal parts 1 Remove the air filter 2 Slacken off the screws that hold the insu...

Page 8: ...LEK GQ2 AZ30 XL31 XL34 XL32 XL33 AA5 GQ3 WM5 EP26 XL40 HQ11 HQ10 UB1 QN37 W2 W1 NIBE ERS 10 500 Chapter 3 The ventilation heat exchanger design 8 3 The ventilation heat exchanger design...

Page 9: ...sor outdoor air BT23 Electrical components Accessory card AA5 Heat exchanger EP26 Cable gland UB1 Cord with connection plug W1 Control cable W2 Ventilation Heat exchanger EP26 Fan exhaust air GQ2 Fan...

Page 10: ...10 Installation from the water seal and forward to the drain must be carried out with a necessary fall of 1 If the unit is installed in a cold area the condensation water drain pipe must be insulated...

Page 11: ...not be used for extract air 900 44 600 4 x 160 32 308 146 146 278 188 146 612 Exhaust air Outdoor air Extract air Supply air Preheating the outdoor air If the extract air temperature is too low the s...

Page 12: ...eries with the previous card Use cable type LiYY EKKX or similar ON 1 2 3 4 5 6 7 8 X9 X2 24 20 21 22 23 15 16 17 18 19 10 11 12 13 14 5 6 7 8 9 1 1 N L PE PE 1 2 3 4 5 6 7 8 2 3 4 5 6 7 8 9 2 3 4 X8...

Page 13: ...The DIP switch AA5 S2 must be set as follows ON 1 2 3 4 5 6 7 8 13 Chapter 5 Electrical connection NIBE ERS 10 500...

Page 14: ...ion is roughly set at installation it is import ant that a ventilation adjustment is ordered and permit ted Caution An incorrectly set ventilation flow can damage the house and may also increase energ...

Page 15: ...ting of accessories Activate exhaust supply air module Menu 5 3 12 exhaust supply air module Settings specific to ERS 10 Lowest extract air temp Set the minimum extract air temperature to prevent the...

Page 16: ...compressor is not running In this case the immersion heater produces heat and or hot water Problems with ERS 10 do not affect the main product s operation You therefore do not need to select aid mode...

Page 17: ...ths of the year that condensation is created because due to the negative pressure in the unit air will be sucked into the unit which will then prevent the condensation water from running off ERS 10 ca...

Page 18: ...Electrical air heater EAH 10 This accessory heats the incoming outdoor air so that the extract air temperature is not too low Part no 067 567 NIBE ERS 10 500 Chapter 10 Accessories 18 10 Accessories...

Page 19: ...Dimensions 900 44 600 4 x 160 32 308 146 146 278 188 146 612 19 Chapter 11 Technical data NIBE ERS 10 500 11 Technical data...

Page 20: ...8 dB A Sound power level LW A Dimensions and weight 2 4 m Length supply cable 2 0 m Length control cable 900 mm Height 600 mm Width 612 mm Depth 40 kg Weight 066 079 Part no 1 287 m3 h at 50 Pa Temper...

Page 21: ...rate 50 Pa Reference pressure difference 0 36 W m3 h Specific power input SPI Clock control 0 95 Control factor and control typology Internt 2 2 Externt 1 3 External leakage rates See user manual Inf...

Page 22: ...Electrical circuit diagram WIRING DIAGRAM ERS 10 500 ELSCHEMA ERS 10 500 051145 0 NIBE ERS 10 500 Chapter 11 Technical data 22...

Page 23: ...4 Recovery 4 M Manage alarm 16 Marking 4 P Pipe and ventilation connections Adjusting ventilation 11 Exhaust air duct 11 Ventilation flow 11 S Safety information Contact information 5 Marking 4 Symbol...

Page 24: ......

Page 25: ......

Page 26: ......

Page 27: ......

Page 28: ...WS name Gemensamt WS version a200 WS release date 2016 06 03 11 12 Publish date 2016 06 03 11 22 NIBE AB Sweden Hannabadsv gen 5 Box 14 SE 285 21 Markaryd info nibe se www nibe eu 331802...

Reviews: