background image

9

al 

We reserve the right to make technical changes 

GB830174Ni/210621 – Translation of the operating manual   NIBE

TM

 AP-WH7

  Seal the thread of the flexible corrugated pipe and 

screw into the tee…

  Screw the 90° elbow onto thread 2 and move into 

the correct position (elbow must face upwards)…

  Stretch the flexible corrugated pipe and insert the seal 

between the elbow and the flexible corrugated pipe…

  Use the union nut to screw together the flexible 

corrugated pipe and the elbow.

 

CAUTION!

 

Tighten the union nut carefully to prevent 
damage to the seal!

INSULATE THE CIRCULATION CONNECTION

 NOTICE

 

The circulation connection is installed 
outside the shell insulation over the Sky 
jacket and is then insulated.

  Push the 110 mm long insulation hose (with pipe cut-

out) over the thread of the circulation connection…

 Insulate the remaining piping of the circulation 

connection with 220 mm long insulation hose (1).

 

Then fix the insulation hoses in 4 places using the 
cable ties (2).

Summary of Contents for AP-WH7

Page 1: ...We reserve the right to make technical changes GB830174Ni 210621 Translation of the operating manual Operating Manual GB MULTI FUNCTIONAL DOMESTIC HOT WATER TANK Accessories for heat pumps NIBE AP WH7...

Page 2: ...manual was written for several different models of the unit always comply with the parameters for the respective model This operating manual is intended only for persons assigned to work on or operat...

Page 3: ...MAINTENANCE OF THE UNIT 5 INSTRUCTIONS FOR QUALIFIED TECHNICIANS SCOPE OF DELIVERY 5 INSTALLATION AND ASSEMBLY 6 Transport to installation location 6 Installation 7 Circulation kit installation 8 Ins...

Page 4: ...expires if work is carried out on the unit and its components contrary to the instructions in this operating manual if work is improperly carried out on the unit and its components if work is carried...

Page 5: ...ck the safety valve provided by customer for the hot water tank at regular intervals It is a good idea to have a maintenance contract with a heating installation company The company will carry out the...

Page 6: ...ou can also transport the unit using a hand truck WARNING Several people are required to transport the unit Do not underestimate the weight of the tank Technical data weight overview CAUTION Wear safe...

Page 7: ...rt Always secure the tank on the hand truck with a ratchet strap INSTALLATION NOTICE Ensure that the foam insulation is still in the bottom of the storage tank WARNING The storage tank must always be...

Page 8: ...rage tank so that the punched out holes fit over the sockets Then close the zip CAUTION The zip must be closed by two people to relieve the strain Replace the tank cover and push the grommets over the...

Page 9: ...rrugated pipe Use the union nut to screw together the flexible corrugated pipe and the elbow CAUTION Tighten the union nut carefully to prevent damage to the seal INSULATE THE CIRCULATION CONNECTION N...

Page 10: ...eating network Note and follow the relevant DVGW regulations and recommendations and the regulations of the water supply company when connecting to the drinking water Integrate the multi functional st...

Page 11: ...rating pressure bar 10 10 10 Test pressure bar 15 15 15 Max operating temperature C 95 95 95 Domestic hot water heat exchanger Exchanger area m 7 5 8 7 10 9 Exchanger volume l 40 46 56 Max operating p...

Page 12: ...1 AG 4 Sensor pocket domestic hot water sensor 13x75 5 Sensor pocket 13x75 6 Heating element hot water max 9kW 1 1 2 IG 7 Domestic hot water return heat pump 1 1 4 IG 8 Circulation top connection kit...

Page 13: ...estic hot water withdrawal 1 AG 4 Sensor pocket domestic hot water sensor 13x100 5 Sensor pocket 13x100 6 Heating element hot water max 9kW 1 1 2 IG 7 Domestic hot water return heat pump 1 1 4 IG 8 Ci...

Page 14: ...stic hot water withdrawal 1 AG 4 Sensor pocket domestic hot water sensor 13x100 5 Sensor pocket 13x100 6 Heating element hot water max 9kW 1 1 2 IG 7 Domestic hot water return heat pump 1 1 4 IG 8 Cir...

Page 15: ...he operating manual NIBETM AP WH7 Installation plan for all storage tanks 1000 800 MF C 1 Legend GB819397 All dimensions in mm We reserve the right to modify technical specifications without prior not...

Page 16: ...r storage tank 51 Separating tank 52 DV RU RLO UHG ERLOHU 53 RRG UHG ERLOHU 54 Domestic hot water tank 55 Brine pressure detector 56 Swimming pool heat exchanger 57 Geothermal heat exchanger 58 Ventil...

Page 17: ...17 al We reserve the right to make technical changes GB830174Ni 210621 Translation of the operating manual NIBETM AP WH7 Hydraulic connection 1 83 83 RGH 67 83 3 0 7 PD 7 75 7 0 7 PD P 76 766 6 3 3...

Page 18: ...18 NIBETM AP WH7 We reserve the right to make technical changes GB830174Ni 210621 Translation of the operating manu Hydraulic connection 2 83 83 8 RGH 67 83 3 0 7 PD 7 75 7 0 7 PD P 76 766 6 3 3...

Page 19: ...19 al We reserve the right to make technical changes GB830174Ni 210621 Translation of the operating manual NIBETM AP WH7...

Page 20: ...3 Fax 97 17 29 33 E mail info volundvt dk www volundvt dk NIBE Systemtechnik GmbH Am Reiherpfahl 3 29223 Celle Tel 05141 7546 0 Fax 05141 7546 99 E mail info nibe de www nibe de CH NIBE W rmetechnik A...

Reviews: