2 Supply and operation
Transport
Assembly
HK 200M indor device must be transported and stored
vertically in a dry place. HK 200M can be, however,
carefully placed on the rear side of the casing when
carrying the device into the building.
Leave 800 mm free space at the front of the mod-
ule. All maintenance works on HK 200M can be done
from the front.
Side covers are installed for permanent, therefore,
they cannot be disassembled.
•
HK 200M must be set on a solid waterproof base
that would keep the weight of the indoor unit. The
regulated legs of the heat pump allow for levelling
and stable setting of the device.
•
Because HK 200M is equipped with condensate
drain, the installation site of the indoor module
must be furnished with a fl oor drain with a dis-
charge to the sewer system.
1. Remove screws at the bottom edge of the front
cover.
2. Tilt the cover at the bottom edge and lift.
Installation site
IMPORTANT
Leave 10 – 25 mm free space between the indoor
module and the back wall for cables and piping.
800 mm
Cover removal
1
2
Chapter 2 |
Supply and operation
20-40 mm
Elements supplied
Safety valve
with a manometer
Wrench size 13