background image

IP RESET Switch

Push the IP RESET switch to the ON position and reboot the controller to reset the IP address
and other TCP/IP settings of the controller to the factory defaults. Refer to the 

Troubleshooting

Network Communication

 section for more information about resetting the IP address. You also

can push this switch to the ON position to unlock a chassis that was previously locked in
MAX.

NO APP Switch

Push the NO APP switch to the ON position to prevent a LabVIEW Real-Time startup
application from running at startup. If you want to permanently disable a LabVIEW Real-Time
application from running at startup, you must disable it in LabVIEW. To run an application at
startup, push the NO APP switch to the OFF position, create an application using the
LabVIEW Application Builder, and configure the application in LabVIEW to launch at
startup. If you already have an application configured to launch at startup and you push the
NO APP switch from ON to OFF, the startup application is automatically enabled. For more
information about automatically launching VIs at startup and disabling VIs from launching at
startup, refer to the 

LabVIEW Help

.

USER1 Switch

You can define the USER1 switch for your application. To define the purpose of this switch in
your embedded application, use the RT Read Switch VI in your LabVIEW Real-Time
embedded VI. For more information about the RT Read Switch VI, refer to the 

LabVIEW

Help

.

Using the RESET Button

Pressing the RESET button resets the processor in the same manner as cycling power.

Understanding LED Indications

Figure 7.

  cRIO-9012/9014 LEDs

1

2

3

4

1. POWER
2. FPGA

3. STATUS
4. USER1

POWER LED

The POWER LED is lit while the cRIO-9012/9014 is powered on. This LED indicates that the
power supply connected to the chassis is adequate.

10

  | 

ni.com

  | 

NI cRIO-9012/9014 User Manual and Specifications

Summary of Contents for cRIO-9012

Page 1: ...Ethernet Port 7 USB Port 8 RS 232 Serial Port This document describes how to connect the cRIO 9012 9014 to a network and how to use the features of the cRIO 9012 9014 This document also contains speci...

Page 2: ...vice in an NI chassis that has been evaluated as Ex nC IIC T4 Ex IIC T4 Ex nA IIC T4 or Ex nL IIC T4 equipment Caution You must make sure that transient disturbances do not exceed 140 of the rated vol...

Page 3: ...ations To verify Lloyd s Register certification for a product visit ni com certification and search for the LR certificate or look for the Lloyd s Register mark on the product Caution In order to meet...

Page 4: ...mm 3 47 in 44 2 mm 1 74 in 1 1 M4 Thread Complete the following steps to install the controller on the chassis 1 Make sure that no power is connected to the controller or the chassis 2 Align the cont...

Page 5: ...better shielded twisted pair Ethernet cable to connect the chassis to an Ethernet hub or use an Ethernet crossover cable to connect the chassis directly to a computer Caution To prevent data loss and...

Page 6: ...it can cause damage to the chassis The cRIO 9012 9014 requires an external power supply that meets the specifications in the Power Requirements section The cRIO 9012 9014 filters and regulates the sup...

Page 7: ...built in reversed voltage protection but reversed voltage can damage connected peripherals if the chassis ground is not reliably connected to earth ground Caution Do not tighten or loosen the terminal...

Page 8: ...ller For example if you connect the pulse per second output of a GPS device to the SMB connector of the cRIO 9012 9014 you can use the GPS device to correct for drift of the system clock For software...

Page 9: ...ode and reformat the controller drive You can put the controller into safe mode by powering it up either with the SAFE MODE switch in the ON position or with no software installed on the drive Refer t...

Page 10: ...n LabVIEW to launch at startup If you already have an application configured to launch at startup and you push the NO APP switch from ON to OFF the startup application is automatically enabled For mor...

Page 11: ...ected an error in its software This usually occurs when an attempt to upgrade the software is interrupted Reinstall software on the controller Refer to the Measurement Automation Explorer Help for inf...

Page 12: ...n Explorer Help for more information about configuring the controller Note If the controller is restored to the factory network settings the LabVIEW run time engine does not load You must reconfigure...

Page 13: ...um input voltage 5 5 V Typical input capacitance 2 5 pF Typical resistive strapping 1 k to 3 3 V USB Port Maximum data rate 12 Mb s Maximum current 500 mA Memory Nonvolatile cRIO 9012 128 MB minimum c...

Page 14: ...you need to clean the module wipe it with a dry towel Tip For two dimensional drawings and three dimensional models of the C Series module and connectors visit ni com dimensions and search by module...

Page 15: ...for direct connection to the MAINS building installations of Measurement Categories CAT II CAT III or CAT IV Caution Do not connect the cRIO 9012 9014 to signals or use for measurements within Measure...

Page 16: ...the product Declaration of Conformity DoC for additional regulatory compliance information To obtain product certifications and the DoC for this product visit ni com certification search by model num...

Page 17: ...tal information not included in this document Waste Electrical and Electronic Equipment WEEE EU Customers At the end of the product life cycle all NI products must be disposed of according to local la...

Page 18: ...Visit ni com services for NI Factory Installation Services repairs extended warranty and other services Visit ni com register to register your NI product Product registration facilitates technical su...

Page 19: ...your service request at ni com support or dial 1 866 ASK MYNI 275 6964 For telephone support outside the United States visit the Worldwide Offices section of ni com niglobal to access the branch offi...

Page 20: ...arty legal notices in the readme file for your NI product Refer to the Export Compliance Information at ni com legal export compliance for the NI global trade compliance policy and how to obtain relev...

Reviews: