
pg. 3
Step1: Ground Preparation (see Diagram 1)
Lay out the bases in the position that you envisage them going
Make sure the frames ‘line’ up with each other and are no more than 8ft apart
When placing the bases please ensure you allow for 6 ft clearance beyond the end of the
slide and 3 ft clearance for all other modules.
Once you are happy that the layout is correct, mark out clearly all 8 corners of the bases
If the climbing frame is on a level surface then dig 4 holes of diameter 12” and depth 12”.
The tricky part is when the surface is uneven; in this case you would have to compensate for
the slope by making some holes deeper than others. The easiest way is to take a spirit level
and see how much the ground slopes and dig the rest of the holes accordingly.
The bottom of all 4 holes need to be level
Step2: Base Preparation
Lay 2 of the 10ft posts that are cut at the 40% angle on a level surface
Ensure the cut angle is facing the same way on both posts and that the 32mm holes (about
halfway up) are facing outwards
Now place the 1571mm 4”x4” post between the 2 larger posts
Line up the markings as shown below
Summary of Contents for Triple 6 foot double climbing frame
Page 15: ...pg 15 Photos that might be useful in building the climbing frame ...
Page 16: ...pg 16 ...
Page 17: ...pg 17 ...