![NI Climbing Frames Tractor and Trailer Assembly Instructions Manual Download Page 3](http://html.mh-extra.com/html/ni-climbing-frames/tractor-and-trailer/tractor-and-trailer_assembly-instructions-manual_1685737003.webp)
pg. 3
Step1: Ground Preparation
Lay out the base, slide and the modules in the position that you intend the climbing frames
to be placed.
Allow for 2.0m clearances beyond the end of the slide and 1.5m clearances for the steps and
rockwall module.
Once you are happy that the layout is correct, set the modules a side
Mark out clearly all 4 notches of the base
Summary of Contents for Tractor and Trailer
Page 15: ...pg 15 ...