Step 3:
•
Make a mark 1800mm (1.8m) from the top of both 2.4m posts.
•
Using a piece of 900
mm 3” x 1.5” timber and the
65mm decking screws, screw the timber to
the 2.4m posts at the 1.8m mark you made on the posts (this is to strengthen the H-frame
structure, without this additional support at the bottom the frame will twist once it is lifted
up)
•
This will be removed at the end of the end of the installation