Step 5:
•
Repeat steps 1-4 for the 2
nd
H-frame
Step 6: (Requires heavy lifting, please use at least 2 people)
•
Dig holes in the grass in the position that you want the climbing frame to be placed with a
diameter of approx. 300mm and 300mm deep.
•
Lift both ‘H’
-frames into the holes that have been cut out in the ground
•
Make sure the
‘H’
-frames are orientated correctly (to ensure that the roof will be able to
rest on the tops)