![NI Climbing Frames Double Climbing Frame Assembly Instructions Manual Download Page 3](http://html1.mh-extra.com/html/ni-climbing-frames/double-climbing-frame/double-climbing-frame_assembly-instructions-manual_1685721003.webp)
pg. 3
Step1: Ground Preparation
Lay out the base, slide and the 10ft swing pole in the position that you intend the climbing
frames to be placed.
Allow for 6 ft clearance beyond the end of the slide and 4 ft clearance for the steps, rock
module and swing module.
Once you are happy that the layout is correct, remove the swing pole, steps and rock wall
and slide.
Mark out clearly all 4 ends of the base area
If the climbing frame is on a level surface then dig 4 holes of diameter 12” and depth 12”.
The tricky part is when the surface is uneven; in this case you would have to compensate for
the slope by making some holes deeper than others (minimum depth of 12”).
The bottom
of all 4 holes need to be level
Step2: Base Preparation
Lay 2 of the 10ft posts that are cut at the 40% angle on a level surface
Ensure the cut angle is facing the same way on both posts and that the 19mm holes (about
halfway up) are facing outwards
Now place the 1274mm 4”x4” post between the 2 larger posts
Line up the markings as shown below
Summary of Contents for Double Climbing Frame
Page 11: ...pg 11 Photos that might be useful in building the climbing frame...
Page 12: ...pg 12...
Page 13: ...pg 13...