![NI Climbing Frames Causeway 6ft Climbing Frame Instruction Manual Download Page 15](http://html1.mh-extra.com/html/ni-climbing-frames/causeway-6ft-climbing-frame/causeway-6ft-climbing-frame_instruction-manual_1685719015.webp)
Step 9: Railings Assembly
•
There are 4 railings per tower. The open ones are typically for the rope bridge, steps,
fireman’s pole, monkey bars and slide; the closed ones are for the rock wall, cargo net and
swing module.
Ensure to fit the railings in their correct positions depending on the desired
layout of the frame. The railing with 3 vertical posts is typically used for the side where the
fireman’s pole and steps will be placed.
They should fit tightly into place between the
upright posts and on the base
•
The ‘double’ timbers on the railings should be on top and the s
ingle timber should be at the
bottom
•
Secure the bottom rail to the base using the decking screws