![NI Climbing Frames Causeway 6ft Climbing Frame Instruction Manual Download Page 14](http://html1.mh-extra.com/html/ni-climbing-frames/causeway-6ft-climbing-frame/causeway-6ft-climbing-frame_instruction-manual_1685719014.webp)
Step 8: Base Assembly
•
The structure should now be able to stand on its own
•
Lift the base and place it onto the two horizontal posts. The 3” x 1.5” base supports should
sit onto the horizontal posts
•
Secure the base to the posts using the 120mm screws provided. They should be screwed
directly into the base down into the 4”
x
4” hor
izontal posts