background image

              YingKou NHT Heavy Machinery Co., Ltd

 

 

platforms more or less, then cover the gears with iron plate. Third, open the front cover of 
control box and unscrew (anticlockwise) the golden bolt of the solenoid discharge valve, 
at the same impulse terminal center thimble, then the platforms will be lifted. 

Tighten  (clockwise)  the  bolt  while  the  platform  lowed  at  the  required  position, 
otherwise, the platform can’t be lifted if power supplied. 

2.

 

PNEUMATIC SYSTEM 

Pneumatic  system  principle  diagram  (see  fig.  7),  compressed  air  must  be  passed  water 
filter,  the  inflation  inlet  is  near  the  oil  sprayer  which  on  the  right  of  the  control  box. 
Whenever up or down the “two-phase and three-way valve” gets electricity, the cylinder 
carries  the  locking  block  up.  When  the  electricity  is  putted  out  the  spring  inset  the 
cylinder will pullback the locking block. 

 

Fig. 7 PNEUMATIC SYSTEM PRINCIPLE DIAGRAM 

Reviews: