![Next SHOREDITCH 832384 Assembly Instructions Download Page 4](http://html1.mh-extra.com/html/next/shoreditch-832384/shoreditch-832384_assembly-instructions_1682611004.webp)
1. Attach centre rail 5 between the brackets on cross
bars 4 (x2) using 2 x bolts (B), 4 x metal washers (E)
and 2 x nuts (C). Tighten with Allen key (F) and
spanner (G).
NOTE: Please ensure that the slat cap holes on the
centre rail 5 face upwards.
1. Attach 2 x support feet 10 to centre rail 5 using 2 x
bolts (B) and 2 x metal washers (E). Tighten with Allen
key (F).
IMPORTANT
Once the feet have been assembled and attached,
they should be adjusted to ensure they do not touch
the floor, (5mm above the floor) to allow for
movement once the mattress is placed on the bed
frame.
It is important to note that when moving the bed that
it is not dragged into its new position to prevent the
possibility of these feet being twisted or angled to one
side, which could lead to the collapse of the centre of
the bed.
To move the bed, remove the mattress and lift the bed
into its new position to avoid damage. Ensure the feet
are at 90° to the floor before replacing the mattress.
STEP THREE
STEP FOUR
STEP FIVE
Page 4 of 5