Next Advance PC77 Operator'S Manual Download Page 4

3

BE SAFE.  ALWAYS MAKE SURE THAT THERE IS NO PRESSURE IN THE CELL BEFORE LOOSENING THE 

BOLTS, AND THAT THE BOLTS ARE SECURELY FASTENED BEFORE APPLYING PRESSURE TO THE CELL.  

USERS MUST ALWAYS WEAR PROTECTIVE APPAREL, INCLUDING EYEWEAR AND MUST BE TRAINED IN 

WORKING WITH HIGH PRESSURE.

Operator’s Manual for the Pressure Injection Cell

The sample tube protrudes from the base for easy 

insertion and removal.

REPLACING THE TOP

     Confirm that the black O-ring is seated in 

its groove. Slip the top onto the base, rotate 

the top 60 degrees clockwise, and then 

tighten the three bolts using a hex wrench. 

Use a hex wrench to tighten the three bolts.

INSERTING A CAPILLARY

     Loosen the nut covering the white ferrule 

using a wrench. Slide the capillary through 

the small hole in the ferrule, until it reaches 

the bottom of the sample tube. Tighten the 

nut, thereby squeezing the ferrule tightly 

around the capillary.

To remove the capillary, loosen the nut and 

slide the capillary out.

INJECTING A SAMPLE

     First point the knob on the 3-way valve 

towards the stainless steel tubing connected 

to the gas tank. Then, while looking away 

covering them (in case they explode when the 

pressure is turned on) open the gas tank 

valve. Adjust the pressure regulator to the 

SETTING UP YOUR PRESSURE 

INJECTION CELL

     Setting up the Pressure Injection Cell 

consists of attaching it to 1/8 inch (outside 

diameter) thick walled stainless steel tubing 

(not supplied with the PC77 Pressure 

Injection Cell). First, slide the tubing through 

the inlet nut until it hits a stop. Finger tighten 

the nut and then tighten it with a wrench for 

1-1/4 turns. Connect the other end of the 

tubing to a pressurized gas tank. It is now set 

up.

USING YOUR PRESSURE              

INJECTION CELL

OVERVIEW

     Using the pressure injection cell requires 

removing the top, inserting your sample, 

replacing the top, and then inserting a 

capillary. Next, inject the sample using 

pressurized gas to force the sample through 

the capillary. After the injection, close the gas 

tank valve and open the 3-way valve to 

release the pressure.

REMOVING THE TOP

     With the valves at the pressure source 

turned off and the 3-way valve opened to 

release any pressure inside the cell, loosen the 

three bolts securing the top, 2 turns each. 

Rotate the top counterclockwise by 60 

degrees so that the hexagonal sides are even. 

Then lift off the top.

INSERTING THE SAMPLE

     Place the sample tube in the main hole of 

the base. The tube should not be capped. If 

the cap is hinged, you must cut off the hinge 

(with scissors). There is a recess in the top so 

the tube can protrude from the base, but a 

hinged cap will not fit in the recess.

from the gas tank gauges and with your hand 

Summary of Contents for PC77

Page 1: ...Pressure Injection Cell Operator s Manual ...

Page 2: ...close the valves on the pressure source and release any pressure from inside the pressure injection cell before opening the cell removing the top or connecting or disconnecting tubing to the cell Never open the valves or try to pressurize the pressure injection cell without all connections properly tightened and the top securely bolted to the base of the cell Wear protective eyewear Users must be ...

Page 3: ...se the test tubes capillary and the Pressure Cell in accordance with local regulations PARTS OF THE PC77 MAG PRESSURE INJECTION CELL Nut Bolt Top Base Teflon Ferrule under the nut 3 Way Valve Inlet Knob Vent Magnetic Stirplate 2 BE SAFE ALWAYS MAKE SURE THAT THERE IS NO PRESSURE IN THE CELL BEFORE LOOSENING THE BOLTS AND THAT THE BOLTS ARE SECURELY FASTENED BEFORE APPLYING PRESSURE TO THE CELL USE...

Page 4: ...lator to the SETTING UP YOUR PRESSURE INJECTION CELL Setting up the Pressure Injection Cell consists of attaching it to 1 8 inch outside diameter thick walled stainless steel tubing not supplied with the PC77 Pressure Injection Cell First slide the tubing through the inlet nut until it hits a stop Finger tighten the nut and then tighten it with a wrench for 1 1 4 turns Connect the other end of the...

Page 5: ...protrude too The adapter is a piece of soft tubing 1 4 inch inside diameter 3 8 inch outside diameter As with any tube with a hinged cap first cut off the hinge so that the top of the tube will fit in the recess in the top of the pressure injection cell Next slide the adapter onto the bottom of the 1 ml sample tube as shown in the figure below STIRPLATE OPERATION PC77 MAG model only Operation of t...

Page 6: ...ease contact customer service by email at support nextadvance com or by telephone SPECIFICATIONS Max Pressure 17 MPa 2500 psi Size 18 cm 6 5 in long x 10 cm 4 in wide x 19 cm 8 in high Weight 1 6 kg 3 5 lbs Relative Humidity 5 90 non condensing Operating Temperature 4 40 C Altitude 2000m Storage Temperature 40 to 50 C Meets requirements Power Requirement PC77 MAG model 24V DC 0 8 A WARRANTY Next A...

Page 7: ...or implied with respect to its Products NEXT ADVANCE MAKES NO WARRANTY RESPECTING THE MER CHANTABILITY OF THE PRODUCTS OR THEIR SUITABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE OR USE Next Advance shall not be liable for indirect special incidental or consequential damages of any nature Any recovery for any claim shall be limited to the original purchase price for the product WARNINGS AND CAUTION...

Reviews: